Laserfiche WebLink
<br />Severance Tax Trust Fund Perpetual Base Account to the BORROWER in an amount up <br />to $4,994,955 for PROJECT costs, not to exceed 90% of the cost of the PROJECT, with a <br />loan origination fee of 1 % in accordance with CWCB Policy No. 16, at an interest rate of <br />3.6% per annum for a repayment term of 20 years. <br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br /> <br />The BORROWER has four outstanding revenue bond issues (1) 1999 Water Revenue! Bond, <br />principal balance $4,100,000, maturing in 2019, with a payment of $381,523 due in 2006; <br />(2) 2002 Water Revenue Bond, principal balance $3,145,000, maturing in 2021, with a <br />payment of $208,645 due in 2006; (3) 2004 Water Revenue Refunding Bond, principal <br />balance $4,635,000, maturing in 2014, with a payment of $258,658 due in 2006; (4) 2004B <br />Water Revenue Refunding Bond, principal balance $5,085,000, maturing in 2020, with a <br />payment of $230,213 due in 2006; and two loans with Colorado Water Resourcf~s and <br />Power Development Authority that mature in 2008 (1) $4,800,000 September 15, 1992, <br />and (2) $1,617,221 September 15, 1998. The parity certificate dated <br />establishing that the lien created by this loan has parity with the liens described above, is <br />incorporated herein by reference. <br /> <br />SECTION 6 - ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br /> <br />No additional conditions. <br /> <br />SECTION 7 - CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br /> <br />B. The BORROWER'S and the Engineering Consultant's plans and specifications must <br />be submitted to the CWCB staff for verification of compliance with the terms of this <br />Contract when available prior to bidding. Any modifications to the plans and <br />specifications must be approved in writing by the CWCB staff. <br /> <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br />by S 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br />State Engineer's Office prior to construction. <br /> <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br /> <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by <br />the BORROWER and found acceptable by the CWCB staff. <br /> <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br /> <br />Appendix 1 to Loan Contract C150210 <br />Page 2 of 4 <br />