My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01935 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01935 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 9:57:29 AM
Creation date
2/26/2008 9:09:02 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150210
Contractor Name
Little Thompson Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"'--' <br /> <br />Little Thompson Water District - Proposed Dry Creek Reservoir <br />September 13-14,2005 <br /> <br />Agenda Item 12a <br /> <br />Cash Reserves to Current Expense I <br />weak: less than 50% 66% 20% <br />average: 50% - 100% (aver.) (weak) <br />stronQ: Qreater than 100% <br />Debt per Tap <br />weak: greater than $5000 $2477 $3150 <br />average: $2500 - $5000 (strong) (aver.) <br />stronQ: less than $2500 <br />Monthly Water Bill <br />average: $30 $48 $64 <br />weak: greater than $60 (average) (weak) <br /> <br />* Includes approximately 10% of L TWO's average tap fee revenues for 2003-04. <br /> <br />As security for the loan, the District will pledge water revenues backed by a rate covenant and <br />annual financial reporting. This is in compliance with CWCB Loan Policy #5 (Collateral). <br /> <br />Recommendation <br /> <br />Staff recommends a loan not to exceed $4,994,955 ($4,945,500 for project costs and $49,455 for the <br />1 % Loan Service Fee in accordance with CWCB Loan Policy #16), to the Little Thompson Water <br />District, acting by and through the Little Thompson Water District Water Activity Enterprise, from the <br />Severance Tax Trust Fund Perpetual Base Account, to construct the proposed Dry Creek reservoir in <br />50/50 partnership with the Central Weld County Water District. The recommended terms of the loan <br />are 20 years at 3.60% per annum. Security for the loan will be a pledge of water rate revenues <br />backed by a rate covenant and annual financial reporting. <br /> <br />Staff further recommends that final approval of the loan be conditioned upon all other standard <br />contracting provisions of the CWCB. <br /> <br />cc: Hank Whittet, District Manager, L TWD <br />Ed Toms, P.E., Boyle Engineering Corporation <br />Amy Stengel, AGO <br /> <br />Attachment <br /> <br />Action Taken bv the CWCS on September 14.2005 <br />The CWCB approved the Staff Recommendation. <br /> <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.