My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01933 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01933 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 11:20:51 AM
Creation date
2/21/2008 4:26:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153471
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />CWCB Construction Fund Loan Application <br /> <br /> <br />. J. <br /> <br />If YES, please explain. The resetvoir currentl has water ri hts for fillin of <br /> <br />the storage volume. Direct flow ri hts will likel <br /> <br /> <br />rovide <br /> <br />7. Please list the names and addresses ofthe Applicants' engineer(s) and attomey(s). <br /> <br />raw water irrigation to the use areas. <br /> <br />NAME <br /> <br />ADDRESS and PHONE <br /> <br />Rocky Mountain Consultants 1900 S. Sunset St., Suite IF Longmont, CO 80501 <br />303-772-5282 <br />Samson. Pipis & Marsh, LLC 515 Kimbark St.. Suite 105. Longmont. CO 80501 <br />303-226-1169 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Feasibility Study Milavec Lake Seepage Investigation (RMC 9/02) <br /> <br />9. Estimated cost of the project. Please include estimated engmeermg costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br />Estimated Total Costs: <br /> <br />$ 125,000 <br /> <br />$1,210,000 <br /> <br />$ 1 , 335,000 <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 1,000,000 <br /> <br />This will be determined by <br />(Usually 75% of Estimated Total Costs) Trus tees <br /> <br />Term (length) ofloan: <br /> <br />30 <br /> <br />years (Usually 10, 20, or 30 years) <br /> <br />Interest Rate: 10: 4.25%, 20: 4.5 % (Please call for our current rates) <br />30:4.75% <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit with this application copies of the two most recent <br />annual reports, fmancial statements, corporate reports or other current documentation of <br />financial condition and operations. <br /> <br />1. List any existing liability or indebtedness that exceeds one thousand dollars. For example, bank <br />loans, government agency loans, bond issues, accounts payable, etc. Include names and <br />addresses of lenders, amounts, due dates and maturity dates. Attach a separate schedule, if <br />needed. Last two years of audits attached. <br /> <br />3 <br /> <br />CFIA602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.