Laserfiche WebLink
<br /> <br />SECTION 4 _ BOARD ApPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> <br />At its September 14, 2005 meeting, the CWeB approved a loan from the CWCB <br />Severance Tax Trust Fund Perpetual Base Account to the BORROWER in an amount up <br />to $4,994,955 for PROJECT costs, not to exceed '90% of the cost of the PROJECT, with a <br />loan origination fee of 1 % in accordance with CWCB Policy No. 16, at an interest rate of <br />3.7% per annum for a repayment term of 20 years. <br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br /> <br />The BORROWER has three outstanding obligations as follows: (1) Central Weld County <br />Water District Water Revenue Refunding Bonds, Series 2004, dated as of May 27, <br />2004, originally issued in the aggregate principal amount of $1,330,000 and currently <br />outstanding in the aggregate principal amount of $1,000,000, maturing on December <br />1, 2007; (2) a Loan Agreement dated September 15, 1992, with the Colorado Water <br />Resources and Power Development Authority, as refunded in October 1998, originally <br />issued in the aggregate principal amount of $~~,200,OOO and currently outstanding in <br />the aggregate principal amount of $845,449, maturing on October 1, 2012; and (3) a <br />CWCB loan , dated May 1, 2005, in the principal amount of $3,937,500, with a 20 <br />year term. The parity certificate signed by Watkins & Schommer, Inc. and dated <br />December 2, 2005, establishing that the lien created by this loan is on parity with the <br />BORROWER'S other debt obligations, is incorporated herein by reference. <br /> <br />SECTION 6 - ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br /> <br />No additional conditions. <br /> <br />SECTION 7 - CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br /> <br />B. The BORROWER'S and the Engineering Consultant's plans and specifications must <br />be submitted to the CWCB staff for verification of compliance with the terms of this <br />Contract when available prior to bidding. Any modifications to the plans and <br />specifications must be approved in writing by the CWCB staff. <br /> <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br />by 9 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br />State Engineer's Office prior to construction. <br /> <br />D. CWeB staff must be present at bid opening and must approve the award of the <br />construction contract. <br /> <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by <br />the BORROWER and found acceptable by th'e CWCB staff. <br /> <br />F. The BORROWER must provide a copy of the executed construction contract <br /> <br />Appendix 1 to Loan C()ntract C150209 <br />Page 2 of 4 <br />