My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150122 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150122 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 9:17:12 AM
Creation date
2/21/2008 4:19:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150122
Contractor Name
Central Weld County Water District
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 03-110
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />PROJECT SUMMARY _ CENTRAL WELD COUNTY WATER DISTRICT - CONTRACT No. C15~0122 <br /> <br />SECTION 1 -BORROWER INFORMATION <br />Name: Central Weld County Water District, acting by and through <br />its Water Activity Enterprise <br />2235 2nd Avenue, Greeley, Colorado 80631 <br />84-0571286 <br />John W. Zadel, General Manager <br />(970) 352-1284 Fax Number: (970) 353-5865 <br />wcwdistrict@qwest.net <br />Special District formed pursuant to and governed by <br />Article 1, Title 32, C.R.S. and located in Weld County. <br />The Central Weld County Water Activity Enterprise is a <br />water activity enterprise established by the District by <br />Resolution dated November 18, 1993, pursuant to Article <br />45.1, Title 37, C. R.S., which resolution is incorporated <br />herein by reference. The Enterprise was formed and is <br />operated as an enterprise within the meaning of COLO. <br />CONST. Art. X, Section 20. <br /> <br />Address: <br />Federal Identification No.: <br />Contact: <br />Phone Number: <br />E-mail address: <br />Type of Entity: <br /> <br />Section 2 - Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br />used for the construction of a new water storage reservoir, located in Larimer <br />County, hereinafter referred to as the PROJECT, at an estimated total cost of <br />$10,500,000. <br /> <br />B. Description of Feasibility Study: The eWCB has reviewed a feasibility study report <br />on the PROJECT compiled by Smith Geotechnical Engineering Consultants, which is <br />incorporated herein by reference, and, based upon the feasibility report, the~ CWCB <br />determined the PROJECT to be technically and financially feasible. <br />SECTION 3 - CWCB's AUTHORITY <br /> <br />Severance Tax Trust Fund Perpetual Base Account: This loan is made pursuant to <br />the provisions of SS 39-29-109(1 )(a)(I), 37-60-119 and 37-60-120, C. R.S., which <br />authorize the CWCB to loan money for water projects from the CWCB Severance Tax <br />Trust Fund Perpetual Base Account for the benefit of the people of the state, provided <br />that the borrower assures repayment of that money. <br /> <br />SECTION 4. BOARD ApPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> <br />At its November 2003 meeting, the CWCB approved a Loan from the Severance Tax <br />Trust Fund Perpetual Base Account to the BORROWER in an amount up to $3,937,500 for <br />PROJECT costs, with repayment terms of 4.15% per annum for 20 years. <br /> <br />Pursuant to Bill 03-110, Section 2.b, the Colorado General Assembly alJthorized <br />CWeB to loan to the BORROWER an amount up to $3,937,500 for the PROJECT <br /> <br />AppendiX 1 to Loan Contract C150122 <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.