Laserfiche WebLink
<br /> <br />STATE OF COLO:RADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />April 1, 2007 <br /> <br />Bill Ritter Jr, <br />Governor <br /> <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br /> <br />Harris D, Sherman <br />Executive Director <br /> <br />Mrs. Sharon Cesar, Town Clerk <br />Town ofKremmling <br />P.O, Box 538 <br />Kremmling, CO 80459-0538 <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Contract Number C 150 126 - Raw Water Pipeline Project <br /> <br />Dear Mrs, Cesar: <br /> <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />April 1, 2007. <br /> <br />In accordance with the Contract, the Town of Kremmling owes $108,115,50 for interest during construction, as <br />calculated on the attached spreadsheet, due by April 20, 2007, Please make your check for interest during construction payable to <br />the Colorado Water Conservation Board and include the Contract Number on the check. <br /> <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your fIrst loan payment in the amOlmt of $100,706.14 is <br />due on April 1, 2008. An adjustment of $36,690.31 has been applied to your principal balance to account for the actual funds <br />expended to construct your project. The annual loan payment was based on the Company's approved contract amount of <br />$1,689,750.00, which results in a term reduction from 30-years to 29-years, as illustrated on the attached Loan Repayment <br />Schedule, Additionally, attached is a copy of the Promissory Note. Al % loan service fee of$16,366,93 has been added to your <br />principal balance for a fmalloan balance of$I,653,059.69, The loan service fee was based on your fmal construction cumulative <br />loan balance of$I,636,692,76. <br /> <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.16" please note that the <br />renewed insurance certifIcates need to be provided to the Colorado Water Conservation Board annually, <br /> <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Town of Kremmling on the <br />successful completion of this project. Please call if you have any questions regarding this matter or if we can be of service to you <br />in the future. <br /> <br />Since:e;~ I r u <br />~/I~!.f/( . <br /> <br />Mike Serlet, P ,E, <br />Chief, Water Supply Planning and Finance Section <br /> <br />cc. <br /> <br />John Redifer, CWCB Board Member <br />Water Supply Planning and Finance Section <br />Project fIle <br />Contract fIle <br /> <br />Contract Amount <br />Expended Amount <br /> <br />= $1,689,750.00 <br />= $1,653,059,69 <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br /> <br />- ---... <br /> <br />-------=-~- - <br />