Laserfiche WebLink
<br /> <br />Town of Kremmling <br />December 4, 2002 <br /> <br />Page 2 <br /> <br />b) An approved contract must be in place before funds can be advanced. Jan IlIian has <br />placed this project on our "hot list" and will initiate the loan contracting process with a <br />goal of having a signed contract in place by March 2003. Once the contract is finalized <br />the Town may request loan funds to cover eligible project expenditures. <br /> <br />c) You must adhere to the CWCB Desian and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCB requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will be <br />the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a loan from the Colorado <br />Water Conservation Board. <br /> <br />~~~ <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Sedion <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo: Kremmllng 1102 memo <br /> <br />cc (w/Attachment 1.): <br /> <br />Mr. Greg Hoskin, Board Member, Colorado Water Conservation Board <br />ewCB Section B Staff <br />Linda BaSsi, AGO <br />Chrono File <br /> <br />C: Projects\Proj-New\Kremmling 1102 Ltr <br />