My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150113 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150113 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:33 AM
Creation date
2/21/2008 3:17:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150113
Contractor Name
Lake Arrowhead Water Association
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />}/ <br /> <br />/ <br /> <br />Lake Arrowhead Water Association <br />September 18, 2002 <br /> <br />Page 2 <br /> <br />3. You must adhere to the CWCB Desiqn and Construction Administration Procedlures. Tim <br />Feehan will contact you regarding the CWCB requirements concerning project bidding, design, <br />and construction. Tim will make construction inspections, which will be the basis lof the pay <br />estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Small Project Loan from the <br />Colorado Water Conservation Board. <br /> <br />~JJ <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />... <br />-I <br /> <br />.. .-..,.Altachments: <br />cc (w/Altachment): <br /> <br />Updated Memo: LakeArrowhead 902memo <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />ewCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />c: wp51\ProJ-New\LakeArrowhead 9021tr <br />
The URL can be used to link to this page
Your browser does not support the video tag.