Laserfiche WebLink
<br />G. Institutional Considerations <br /> <br />Table VI-5 shows permits and agreements, which may be required for the construction of this <br />project. These are standard for this type of construction and little difficulty is foreseen in obtaining <br />all required permits due to prior coordination with the agencies during this study. <br /> <br />eQUlre rOlec erml s <br />Permitting Authority Permit, Approval or Agreement R,equired <br />U.S. Arn1Y Corps of Engineers Nationwide 404 Permit <br />Division of Water Resources Approval of design <br />Water Quality Control Division Construction Dewatering Permit <br /> <br />R <br /> <br />Table VI-4 <br />d P . t P <br /> <br />'t <br /> <br />H. Benefits <br /> <br />If this project is not built and the reservoir asset is lost due to a possible breach order from the <br />State Engineer the loss would be borne by the Company. The lake is used for storage for irrigation <br />water critical to the Company users. The cost to perform the work is approximately $1,760/AF of <br />storage, based on a reservoir storage volume of 230 AF. <br /> <br />Lake Arrowhead Dam Rehabilitation Feasibility Study <br /> <br />16 <br /> <br />13I.':JVLE <br />