My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150113 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150113 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:33 AM
Creation date
2/21/2008 3:17:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150113
Contractor Name
Lake Arrowhead Water Association
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />BCJ~LE <br /> <br />215 Union Blvd., Suite 500 <br />Lakewood, CO 80228 <br />TEL: (303)987 -3443 <br />FAX: (303)987 -3908 <br />www.boyleengineering.com <br /> <br />Mr. John Van Sciver <br />COLORADO WATER CONSERVATION BOARD <br />1580 Logan Street, Suite 750 <br />Denver, CO 80203 <br /> <br />December 28, 2003 <br /> <br />Revised CWCB Lake Arrowhead Dam Rehabilitation Feasibilitv Study <br /> <br />On behalf of the Lake Arrowhead Water Association, Boyle Engineering Corporation is pleased <br />to submit the enclosed one (I) bound and one (I) unbound copies of the revised Lake <br />Arrowhead Dam Rehabilitation Feasibility Study. The study examines the feasibility of non- <br />structural and structural alternatives to rehabilitate Lake Arrowhead Dam; and demonstrates the <br />technical, financial, environmental, and institutional feasibility of the alternatives. <br /> <br />The study has been prepared in conformance with requirements for funding of the Colorado <br />Water Conservation Board and the dam safety regulations of the Colorado State Engineer's <br />Office. <br /> <br />Please give me a call if you have any questions. <br /> <br />Sincerely, <br /> <br />~ee <br />~foms, p <br /> <br />Project Manager <br /> <br /> <br />Enclosure: CWCB Report <br /> <br />Copies to: Mr. Dwight Giles - Lake Arrowhead Water Association <br /> <br />BOYLE ENGINEERING CORPORATION <br /> <br />@ Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.