Laserfiche WebLink
<br />. . <br /> <br />Town of Dove Creek Lavvn Garden Water <br />Preliminary Cost Estimate <br /> <br />Size Feet . $/foot T Total <br />10" pipe 8660 $16.61 $143,843.00 <br />8" pipe 7480 $10.37 $77,568.00 <br />6" pipe 16,480 $6.05 $99,704.00 <br />. Sub Total $321,115.00 <br />Highway Boring $30,000.00 <br />Pumping Plant $30,000.00 <br />Electrical Service $20,000.00 <br />Utility Crossing $50,000.00 <br />Pavement Patching & Resurfacing $40,000.00 <br />Reservoir $40,000.00 <br />Water Meters 409 x $650.00 or 200 meters $ 130,000.00 <br /> . . <br />Rock Trenching $150,000.00 <br /> Sub total $490,000.00 <br /> Total Construction $811,115.00 <br />Contingencies 10% $81,111.50 <br /> Sub Total $892,226.50 <br />Engineering/Administration 10% $89,222.65 <br /> JmaI. $98144915 <br /> TAP TAP FEES <br />Total Residential Taps 409 $2,399.63 <br />Total Residential and Commercial Taps 505 $ 1,943.46 <br />90% 409 Taps 368 $2,666.98 <br />75% of the Residnetal Taps 307 $3,196.90 <br />60% of the Residental Taps 245 $4,005.91 <br />50% for Residental Taps 205 $4,787.56 <br /> <br />(2-6-03) <br />