My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01903 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01903 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:32 AM
Creation date
2/21/2008 3:05:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150162
Contractor Name
Johnson and Edwards Ditch Company
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Johnson & Edwards Recharge Cost Estimates <br />For recharge through existing diversion system only <br /> <br />Earthen Berm in Draw: <br /> <br />Earthen Material <br />compacted placement <br /> <br />36" culvert <br /> <br />Placed Concrete <br /> <br />Outlet Control Gate <br /> <br />Clock & Recorder <br /> <br />Estimated total cost <br /> <br />End of canal <br /> <br />Measuring Flume, Clock & Recorder <br /> <br />Grade control measures <br /> <br />Estimated total cost <br /> <br />Fritzler Pivot <br /> <br />Berm plus fill in field <br />Berm only <br /> <br />Bruce Gill family site next to highway, section 15 <br /> <br />Measuring Flume, Clock & Recorder <br /> <br />Rebuild ditch pad east of US 6 <br /> <br />Berm along highway <br /> <br />Berm along Prewitt Inlert <br /> <br />Estimated total cost <br /> <br />Conveyance through Tom Gill farm <br /> <br />580 yd3 <br /> <br />60 ft <br /> <br />16 yd3 <br /> <br />$1 ,450 <br />$1,200 <br /> <br />$3,200 <br /> <br />$1,000 <br />$2,000 <br />$8,850 <br /> <br />$3,000 <br /> <br />$1,500 <br />$4,500 <br /> <br />$12,200 <br />$7,300 <br /> <br />$3,000 <br />$1,000 <br /> <br />$3,200 <br /> <br />$4,800 <br /> <br />$12,000 <br /> <br />24" Culverts <br />Place Culverts <br /> <br />Measuring Flume, Clock & Recorder <br />[Use common measurement with end of canal] <br /> <br />$400 <br />$250 <br /> <br />Estimated total cost <br /> <br />Maximum Estimated Cost (wlFrltzler Field Fill) <br /> <br />Recharge Pump Cost Estimates <br /> <br />Leaf Site: <br /> <br />Drill Well, Pump & Motor <br /> <br />Electrical Service <br /> <br />Pipeline <br /> <br />2400 ft <br />1300 <br /> <br />Can~1 Crossing <br />Total yost <br /> <br />Purc:",~, of J<l~lllilln !,.lIke Share <br /> <br />Overall Project Cost <br /> <br />$80 ft <br /> <br />$650 <br /> <br />$38,200 <br /> <br />$30,000 <br />$3.000 <br />$16,272 <br />$750 <br />$50.022 <br /> <br />$20,000 <br /> <br />5134,222 <br />
The URL can be used to link to this page
Your browser does not support the video tag.