My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01903 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01903 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:32 AM
Creation date
2/21/2008 3:05:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150162
Contractor Name
Johnson and Edwards Ditch Company
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />6. Will the acquisition of additional water rights be necessary? YES X NO <br />If YES, please explain. <br /> <br />We are applying for a new diversion right from the South Platte River for recharge water. This <br />application will include surface diversion and establishment of at least one recharge well within 100 <br />feet of the stream. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br />NAME ADDRESS and PHONE <br />Attorney: Robert B. Chapin P. O. Box 7, Brush CO 80723 Ph. 9708425561 <br />Attorney: Kim Lawrence 1011 Eleventh Avenue, Greeley CO 80631 Ph. 9703569160 <br />Engineer: Charles Leaf 59365 County Road R, Merino CO 80741 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in progress <br />for the proposed project. Please submit one copy of each completed study with this application. <br /> <br />Estimated construction cost prepared by Tom Gill, (EIT) [See attached spreadsheet] <br /> <br />Depletion Calculations and augmentation needss prepared by Charles Leaf: (PE) [In Progress] <br /> <br />9. Estimated cost of the project. <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: <br /> <br />Estimated Construction Costs: <br /> <br />Estimated Total Costs: <br /> <br />Please include estimated engineering costs, and estimated <br /> <br />$ 13,000 <br /> <br />$134,222 <br /> <br />$147,222 <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $132,500 <br />Term (length) ofloan: 30 years <br />Interest Rate: 2.5 % <br /> <br />(Usually 75% of Estimated Total Costs) <br />(Usually 10,20, or 30 years) <br /> <br />(Please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is also <br />requested that the project sponsor submit with this application copies of the two most recent annual <br />reports, financial statements, corporate reports or other current documentation of financial condition <br /> <br />3 <br /> <br />CFLA902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.