My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01903 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01903 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:32 AM
Creation date
2/21/2008 3:05:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150162
Contractor Name
Johnson and Edwards Ditch Company
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Rights <br /> <br />The JEDC has rights to divert a total of 63 cfs from the South <br />Platte River (15 cfs under priority 5 dated 1872, and 48 cfs <br />under priority 29 dated 1886.) The Company diverts approximately <br />6,000 acre-feet of water per year through their ditch. <br /> <br />The 7 shareholders of the JEDC also have decrees on 12 wells used <br />for irrigating the 3,000 acres under their system. These wells <br />have been augmented through GASP in prior years. The JEDC diverts <br />on average approximately 2,900 acre-feet of water per year <br />through these 12 wells. Total average annual diversions for the <br />JEDC shareholders are 8,900 acre-feet. <br /> <br />The JEDC is applying for a 63 cfs augmentation water right for <br />this project under which they would divert approximately 2,000 <br />acre-feet per year. This would be used to cover the depletions of <br />the 12 junior wells, as well as provide additional water to <br />augment other wells outside the Johnson and Edwards system. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $144,222. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Total Cost <br /> <br />$ 13,000 <br />$134,222 <br /> <br />$147,222 <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Recharge Well <br />2. Earthen Berm in Draw <br />3. End of Canal (measuring Devices) <br />4. Fritzler Pivot Berm <br />5. Bruce Gill Augmentation' Site <br />6. Conveyance through Tom Gill Farm <br />7. Jackson Lake Share <br />9. Contingency <br />8. Planning and Design Costs <br /> <br />$ 50,022 <br />$ 8,850 <br />$ 4,500 <br />$ 12,200 <br />$ 12,000 <br />$ 650 <br />$ 20,000 <br />$ 26,000 <br />$ 13,000 <br /> <br />Total Cost <br /> <br />$147,222 <br /> <br />Feasibility Study <br />JEDC Aug Project <br />October 2003 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.