My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01898 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01898 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:25 AM
Creation date
2/21/2008 2:45:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153700
Contractor Name
Norwood, Town of and Norwood Water Commission
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />Frank M. Akers, P.E., Chief <br />Project Planning and Construction Section <br />Page 2 <br /> <br />Improvement of our water treatment process is our next focus, <br />Converting our filtering system and upgrades at the treatment plant <br />subtotal another $159,00. <br /> <br />Once we have treated the water, we will move on to the storage <br />aspects that need to be addressed. Renovation of our unused <br />storage tank along wi th piping and other improvements subtotal <br />$97,900. Total construction costs of $609,300, plus 15% for legal <br />and engineering fees bring the project cost to $700,695. <br /> <br />Based on a proposed $320,000 loan, combined wi th a grant for <br />$300,000 and coupled with our $80,000, the first phase of the <br />project could be completed. <br /> <br />We have in fact proceeded beyond the feasibility study and ordered <br />thl~ design work for our treatment plant. This project is that <br />urgent to our communities existing needs. Final design for <br />converting our filtering system is in progress by Westwater <br />Engineering. The design is aimed at improving the quality of water <br />as well as the capacity. <br /> <br />Existing needs far outweigh any growth issues. However, the study <br />addresses those concerns as well. In the two years of the tap <br />moratorium our needs have increased. Mailbox rentals have <br />increased in our service area by 28 boxes constituting an increase <br />of approximately 10 %. The School District literally patch worked <br />hOUSing together for the four teaching posi tions it recentl y <br />filled. The major concern in attracting quality education was the <br />housing shortage. The high school graduating classes, along with <br />new residents moving in, has made natural growth inevitable. In <br />some cases, families have even doubled up in single family <br />residences. <br /> <br />While our need is urgent, our financial constraints are obvious. <br />The 1990 census outlined that. Norwood's per capita income is <br />approximately $10,507.00. We would like this to be weighed in the <br />decision of the loan interest rate. Actually, we are requesting a <br />0% loan to meet our needs should you regard this proposal. A 5% <br />loan woul d increase our existing debt repayment of $700,000 by <br />approximately $25,000 per year. We are prepared to increase our <br />user fees by approximately $4.00 per month per existing tap to meet <br />this payment. <br /> <br />With Phase II and III in our future goals, and the burden of our <br />existing $700,000 debt, we request that you consider the lowest <br />interest rate available. <br /> <br />A proposal is currently underway to combine the Town of Norwood and <br />the Wright's Mesa Rural Water users into a single system entity. <br />An actual agreement is pending, and details are being worked out. <br />
The URL can be used to link to this page
Your browser does not support the video tag.