My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01898 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01898 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:25 AM
Creation date
2/21/2008 2:45:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153700
Contractor Name
Norwood, Town of and Norwood Water Commission
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />Colorado Water Conservation Board <br />October 29, 1992 <br />Page 4 <br /> <br />our operations, <br /> <br />The Town must be in a position to build capital reserves. They <br />will be surely needed. Phases II and III are pending and the Town <br />needs to build reserves to apply for matching fund grants. Our <br />exi sting debt of $700,000 wi t.h an addi t.i onal $370,000 in loans <br />brings our total indebt.edness to $1,070,000, maximizing our <br />borrowing pot.ential. <br /> <br />I hope this helps to clarify our position. <br />considerat.ion t.o our loan request. <br /> <br />Thank you for your <br /> <br /> <br />-~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.