Laserfiche WebLink
<br />Lo~ Appl,u,h"l\.- <br /> <br />jCffe" <br /> <br />.) <br /> <br />PHYSICAL IMPROVEMENTS COST ESTlMATE WORKSHEET <br />(Required for projects Involving structures and facilities other. <br />than slnglErfamlly housing units) <br /> <br />SOURCE OF ESTlMATE: Westwater EnF!;ineering <br /> <br />DATE OF ESTIMATE: 4 - 9 - 9 2 <br /> <br />I <br /> <br />Act. <br />No. <br />I <br /> <br />Description <br /> <br />No. of Units <br />or Size <br /> <br />Unit <br />Price <br /> <br />Total <br />Cost <br /> <br />. . <br />WATER TREATMENT SYSTEM <br />gravity filter system <br />upgrade other treatment units <br />miscellaneous improvements <br /> <br />$135,60 <br />$ 15,60 <br />$ 8,50 <br /> <br />subtotal <br /> <br />$159,70 <br /> <br />.II <br /> <br />DISTRIBUTION SYSTEM <br />renovate old storage tank <br />piping & tank improvements <br /> <br />subtotal <br /> <br />$ 53,00 <br />$ 44,9C <br /> <br />------- <br /> <br />$ 97,9C <br /> <br />III RAW WATER SYSTEM <br />general improvements/res.& <br />piping <br />flow measurement system <br />domestic pipeline--8" DIP <br /> <br />$ 14,4 <br />$ 10 i 1 <br />$327,2 <br /> <br />a: <br /> <br />subtotal <br /> <br />$351,7 <br /> <br />TOTAL CONSTRUCTION COSTS <br /> <br />$609,3 <br /> <br />E~GINEERING/LEGAL FEES (15%) <br /> <br />$ 91.3 <br /> <br />$700,t <br /> <br />TOTAL ALL COSTS <br /> <br />. ~' ... <br /> <br />~ I. <br /> <br />) <br /> <br />o <br />