Laserfiche WebLink
<br />Silt Water Conservancy District <br />March 24-26, 2003 <br /> <br />Agenda Item 24a. <br />(updated March 27, 2003) <br /> <br />Water Riahts <br />The District's primary water right consists of a 10,384 acre-foot storage right in Rifle Gap ReseNoir <br />with a priority date of 1951. The District also has a 1961 right out of the Colorado River (36 cfs), with <br />average annual diversions of 4000 acre-feet. The Bureau of Reclamation has set aside 5,000 acre- <br />feet of water from Green Mountain ReseNoir for use as a replacement source for out-of-priority <br />diversions by the Silt Pumping Plant. <br /> <br />Proiect Description <br />Four alternatives were analyzed in the feasibility study for replacement of the transformer: <br /> <br />1. The no-action alternative. <br />2. Obtain power from an Xcel Energy distribution line and upgrade pumps and motors to meet <br />that voltage. <br />3. Replace the transformer and upgrade pumps and motors. <br />4. Replace the transformer with a voltage configuration that will allow upgrading of pumps and <br />motors at a later date. <br /> <br />Alternative 1, the no-action alternative, was ruled out because it will mean that the District would not <br />be able to pump from the Colorado River, and would loose an annual supply of 4,000 acre-feet. <br />Alternatives 2 and 3 were both ruled out due to cost. Alternative 4 was selected, since it is <br />considered to be a reliable approach, and is less costly. <br /> <br />Selected Alternative 4 involves replacement of the existing transformer with 2 transformers that are <br />compatible with the existing pumps and motors, as well as with new pumps and motors that will be <br />installed at a later date. The cost estimate is as follows: <br /> <br />Total Estimated Cost <br /> <br />$176,000 <br />35,000 <br />50,000 <br />106.000 <br />$367,000 <br /> <br />$ 15,000 <br />44,000 <br />40,000 <br />25,000 <br />49.100 <br /> <br />$540,100 <br /> <br />115/69 -- 13.8kV transformer <br />13.8 -- 2.4kV transformer <br />3 -- 115kV line structures <br />Related work <br /> <br />Subtotal Construction <br /> <br />Planning <br />Design <br />Construction management and inspection <br />Commissioning <br />Contingency at 10% <br /> <br />The implementation schedule calls for completion of financing arrangements in Spring 2003 and <br />start of design work in fall 2003. The project would be completed in late 2004 or early 2005. <br /> <br />Financial Analvsis <br />The total estimated cost of the project is $540,100. Staff is recommending a Small Project Loan of <br />$486,000 (90 percent of the estimate cost.) The SWCD is an agricultural water provider and the <br />CWCB agricultural interest rate of 2.75% for a 30-year loan would apply. The CWCB loan payment <br />(including the 10% reserve requirement) would be $26,400 per year. The SWCD will fund their <br />portion out of cash reserves and will cover any costs that exceed the estimated project cost. The <br />District will fund all loan payments from current revenues, and no assessment or tax increase will be <br />necessary. <br /> <br />2 <br />