Laserfiche WebLink
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />FAX: (303) 866 -4474 <br />www.cwcb.state.co.us <br />May 3, 2007 <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br />Mr. Robert Morris, President <br />Young Creek Reservoir Company <br />1948 Highway 65 <br />Cedaredge, CO 81413 <br />Re: Contract Number C150187 — Young Creek Reservoir Rehabilitation <br />Dear Mr. Morris: <br />Bill Ritter Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Rod Kuharich <br />CWCB Director <br />Dan McAuliffe <br />Deputy Director <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />March 1, 2007. <br />In accordance with the Contract, the Young Creek Reservoir Company owes $4,168.76 for interest during construction, <br />as calculated on the attached spreadsheet, due by May 28, 2007. Please make your check for interest during construction payable <br />to the Colorado Water Conservation Board and include the Contract Number on the check. <br />Your first loan payment in the amount of $4,524.76 is due on March 1, 2008. The $4,524.76 annual loan payment was <br />calculated based on a final loan balance of $94,704.60 at 2.5% for 30- years. A 1% loan service fee of $937.67 has been added to <br />your principal balance and was based on your final cumulative loan balance of $93,766.93. Vaughn McWilliams, our Contract <br />Administrator, will be amending the Promissory Note, contained as Appendix 2 of the Contract, to reflect the amended final loan <br />amount. <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.16, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Young Creek Reservoir Company on <br />the successful completion of this project. Please call if you have any questions regarding this matter or if we can be of service to <br />you in the future. <br />Sincerely, <br />GXS�° --ems <br />Mike Serlet, P.E. <br />Chief, Water Supply Planning and Finance Section <br />CC. John Redifer, CWCB Board Member <br />Water Supply Planning and Finance Section Contract Amount = $197,354.00 <br />Project file Expended Amount = $94,704.60 <br />Contract file <br />Flood Protection • Water Supply Planning and Finance • Stream and Lake Protection <br />Water Supply Protection • Conservation and Drought Planning <br />