My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01888 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01888 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2012 9:39:04 AM
Creation date
2/21/2008 2:09:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150229
Contractor Name
Logan Irrigation District
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />FAX: (303) 866.4474 <br />www.cwcb.state.co.us <br />June 26, 2007 <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br />Mr. Jim Yahn, Manager <br />Logan Irrigation District <br />P.O. Box 333 <br />Sterling, CO 80751 <br />Re: Contract Number C 150229 — Prewitt Reservoir Spillway Improvements <br />Dear Mr. Yahn: <br />Bill Ritter Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Rod Kuharich <br />CWCB Director <br />Dan McAuliffe <br />Deputy Director <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />June 1, 2007. <br />In accordance with the Contract, the Logan Irrigation District owes $4,351.58 for interest during construction, as <br />calculated on the attached spreadsheet, due by July 13, 2007. Please make your check for interest during construction payable to <br />the Colorado Water Conservation Board and include the Contract Number on the check. <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your first loan payment in the amount of $31,937.08 is <br />due on June 1, 2008. An adjustment of $6,323.51 has been applied to your principal balance to account for the actual funds <br />expended to construct your project. The annual loan payment was based on the District's approved contract amount of <br />$505,000.00, which results in a reduction to your last payment, as illustrated on the attached Loan Repayment Schedule. <br />Additionally, attached is a copy of the Promissory Note. A 1% loan service fee of $4,937.39 has been added to your principal <br />balance for a final loan balance of $498,676.49. The loan service fee was based on your final cumulative loan balance of <br />$493,739.10. <br />hi accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.16, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Logan Irrigation District on the <br />successful completion of this project. Please call if you have any questions regarding this matter or if we can be of service to you <br />in the future. <br />Sincerely, <br />Mike Serlet, P.E. <br />Chief, Water Supply Planning and Finance Section <br />C. Eric Wilkinson, CWCB Board Member <br />Water Supply Planning and Finance Section Contract Amount = $505,000.00 <br />Project file Expended Amount = $498,676.49 <br />Contract file <br />Flood Protection • Water Supply Planning and Finance • Stream and Lake Protection <br />Water Supply Protection • Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.