My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01885 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01885 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 1:45:51 PM
Creation date
2/21/2008 2:03:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150229
Contractor Name
Logan Irrigation District
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 2. Financial Summary <br /> <br />Proiect Cost $337,095 <br />Loan Amount (90% of Project Cost) $303,385 <br />CWCB Loan Pavment Amount, including 10% loan reserve $21,108 <br />Payment from Iliff Irrigation District $5,447 <br />Payment from Morgan Prewitt Reservoir Companv $4,086 <br />Remainina Pavment required of Logan Irrigation District $11,575 <br />Number of Landowners 128 <br />Number of Acres in the District 12,818.9 <br />Current Assessment per acre $2.60 <br />Future Assessmemt per Share $2.60 <br />Annual Project Cost per acre-foot $3.47 <br />(Averaae annual delivery: 0.75 acre-feet/acre) <br /> <br />Since 90% of the! funding for the project is from the CWCB and the LID has sufficient reserves, <br />no other debt service is required for this project. As stated above, the operation and <br />maintenance costs are expected to decrease with the new structure due to a decrease in <br />engineering expense, and can be accommodated by the District's existing budget. The annual <br />end of year financial statements for the years 2004 and 2005 for Logan Irrigation District, the Iliff <br />Irrigation District, and the Morgan Prewitt Reservoir Company along with the LID's 2006 budget <br />and the Prewitt Operating Committee's 2006 expense budget is provided in Appendix G. <br /> <br />Credit worthiness <br /> <br />LID has no existing debt. Table 3 shows the Financial Ratios for the LID and indicates average <br />to strong ability to repay with the project in place. <br /> <br />Table 3. Fina.ncial Ratios <br /> <br /> <br /> <br />151% <br />$3.47 <br /> <br /> <br />213% <br />$3.47 <br /> <br /> <br />Alternative Financing Considerations <br /> <br />The LID has not investigated any alternative financing sources. <br /> <br />Logan Irrigation District <br />Emergency Spillway Feasibility Study <br />March 30, 2006 <br /> <br />Page 11 of12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.