My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01882
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 2:54:12 PM
Creation date
2/21/2008 1:53:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150165
Contractor Name
Lower Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Rights <br /> <br />There are 90 shareholders in the LPBCC with rights to divert 322 <br />cfs from the South Platte River consisting of a 38 cfs right <br />(1882), and a 284 cfs right (1888). The LPBCC also own 127 <br />private rights in the Riverside Reservoir and Land Company and 33 <br />shares of Jackson Lake. <br /> <br />The LPBCC have a 1972 recharge/augmentation decree for 322 cfs <br />and have filed for a 2003 recharge/augmentation decree also for <br />322 cfs. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $345,000. Project planning <br />and engineering design will be provided by Brent Nation of Nation <br />Engineering Services, LLC. <br /> <br />Estimated Cost <br /> <br />Item <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />$ 15,000 <br />$330,000 <br /> <br />Total Cost <br /> <br />$345,000 <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Recharge Well <br />2. Pipeline (4500'-21" & 2000'-18") <br />3. Electrical (recharge well) <br />4. Dirt Work (2 ponds) <br />5. Monitoring Well <br />6. Land Purchase (7 & 25 acre sites) <br />7. Survey (2 purchased sites) <br />8. Legal Work (2 purchased sites) <br />9. Concrete Turnout & Weir (3 total) <br />10. Parshall Flume (24 total) <br />11. Recorders (24 total) <br />12. Well Permits (24 total) <br />13. Contingency <br />14. Planning and Design Costs <br /> <br />Total Cost <br /> <br />$ 29,500 <br />$ 52,000 <br />$ 14,500 <br />$ 27,100 <br />$ 1,200 <br />$ 65,000 <br />$ 6,500 <br />$ 1,600 <br />$ 22,500 <br />$ 28,800 <br />$ 48,000 <br />$ 1,800 <br />$ 31,500 <br />$ 15,000 <br /> <br />$345,000 <br /> <br />Feasibility Study <br />Lower Platte and Beaver <br />Augmentation Project <br />January 2004 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.