Laserfiche WebLink
<br />. Table of Contents (Continued) <br /> 10.1.2 Baca Ranch Water Supply and Delivery Project ! . 84 <br /> 1 <br /> 10.1.3 CSU Southern Delivery Pipeline I 85 <br /> 10.1.4 Conversion of Agricultural Water Rights 87 <br /> 10.1.5 Potential "Big Straw" Project . , 88 <br /> I' <br /> 10.1.6 Designated Basins , 89 <br /> , <br /> I' <br /> , <br /> 10.1.7 Other CSU Import Projects , 90 <br /> , <br /> , . <br /> 10.2 Implications ofImport Water Projects , 90 <br /> I' <br /> 10.3 Conjunctive Use. 91 <br /> 10.4 Conclusions 92 <br /> 11.0 Current County Water Supply Standards ' . 94 <br /> 11.1 Historical Background 94 <br /> 11.2. Evaluation of the 300- Year Rule 96 <br />ii 11.2.1 Maintain Water for 300 Years. 96 <br />. 11.2.2 Development of Renewable Water 99 <br /> 11.3 Future Impacts of the 300- Y ear Rule 100 <br /> 11.3.1 Numerical Model 101 <br /> 1 <br /> 1 <br /> 11.3.2 Modeling Results , 103 <br /> , . <br /> , <br /> I <br /> 11.4 Conclusions , 107 <br /> , . <br /> , <br /> , <br /> I <br /> , <br /> I <br /> References I R-l <br /> I . <br /> , <br /> , <br /> Glossary , G-l <br /> , . <br /> , <br /> 1 <br /> I <br /> <br />, <br />" <br />. <br /> <br />IV <br /> <br />WaterReport.doc <br /> <br />September 5, 2002 <br />