Laserfiche WebLink
<br />Page 2 of 2 I <br /> <br />IDate: September 14, 2006 ICase No.: 06-08-B501A <br /> <br />I <br /> <br />LOMA-DEN <br /> <br />8f"RTAt" <br />a~..,. <br />~~~ <br />~ <br />~DSt.C <br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />LETTER OF MAP AMENDMENT <br /> <br />DETERMINATION DOCUMENT (NON-REMOVAL) <br />ATTACHMENT 1 (ADDITIONAL CONSIDERATIONS) <br /> <br />LEGAL PROPERTY DESCRIPTION (CONTINUED) <br />regulations for floodplain management. In addition, placement of fill within a regulatory f100dway may result in a <br />violation of the NFIP regulations. <br /> <br />STUDY UNDERWAY (This Additional Consideration applies to all properties in the LOMA-DEN <br />DETERMINATION DOCUMENT (NON-REMOVAL)) <br />This determination is based on the flood data presently available. However, the Federal Emergency <br />Management Agency is currently revising the National Flood Insurance Program (NFIP) map for the community. <br />New flood data could be generated that may affect this property. When the new NFIP map is issued it will <br />supersede this determination. The Federal requirement for the purchase of flood insurance will then be based on <br />the newly revised NFIP map. <br /> <br />This attachment provides additional information regarding this request. If you have any questions about this attachment, please contact the <br />FEMA Map Assistance Center loll free at (877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management <br />Agency,3601 Eisenhower Avenue, Suite 130, Alexandria, VA 22304-6439. <br /> <br />U/~ Ii' M....z;; I)- <br /> <br />William R. Blanton Jr., CFM, Chief <br />Engineering Management Section <br />Mitigation Division <br />