Laserfiche WebLink
<br />Resolution of Design Deficiencies <br /> <br />Complete plant physical infrastructure <br />Replace Tecan diluter <br />Install electro chlorination system for PS1 <br />Install MODE II blend system <br />Replace high pressure pump discharge valves and actuators <br />Upgrade plant air system <br /> <br />Replace high pressure RO pumps <br />Construct third sludge disposal stage <br />Replace control block isolation valves and actuators <br />Install clearwell pH control system <br />Replace element storage biocide system <br />Replace production plant 501 equipment <br />Replace test train 501 equipment <br />Install chlorine containment system <br />Access and repair coating on SCR1 <br /> <br />c::J <br />C <br />c:::;;, <br />c".) <br />.- <br />o <br /> <br />Replace plant ammonia system <br />Replace failed segment of ERU reject piping <br /> <br />August 2003 <br />