Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />a <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />OD25~7 <br /> <br />Imperial Dam. This division receives the sediment generated in the Parker, Palo Verde, and <br />Cibola Divisions. The sediment load arriving in the Imperial Division is either deposited in <br />the overflow areas outside of the main channel or eventually arrives at Imperial Dam to be <br />removed in the desilting works and the forebay of the dam. <br /> <br />In planning for the Parker, Palo Verde, and Cibola Divisions, reducing the sediment flowing <br />into the Imperial Division was a major objective. Reclamation continually collects and <br />processes data on sediment transported by the river. This allows needs to be defined, <br />appropriate corrective measures to be instituted, and the results of control measures to be <br />adequately evaluated. <br /> <br />Most of the diverted sediment is removed by the Desilting Works for the All-American <br />Canal, returned to the river below Imperial Dam and dredged to permanent dry land storage <br />areas near the Laguna Settling Basin, located about 1 mile above Laguna Dam. The desilting <br />works for the Gila Gravity Canal are maintained periodically, by sluicing sediment <br />accumulations down to the Laguna Settling Basin for removal by dredging. <br /> <br />Dredging above Imperial Dam is conducted periodically to maintain diversions for water <br />demand into the All-American Canal on the west end of the dam and the Gila Gravity Main <br />Canal on the east end. <br /> <br />In the main channel above the California sluice gates on the California side of Imperial Dam, <br />about 900,000 cubic yards of material have accumulated over a period of years. This <br />material will eventually be pumped into the river channel below the dam, probably in the <br />next 3 to 5 years. This area is approximately 480 feet by 2,500 feet and is to be cleaned to a <br />depth of about 20 feet. Normally it takes approximately 6 months to a year to clean this <br />area. <br /> <br />The Gila Gravity con~eyance channel, just upstream from the dam face, has required <br />periodic work. About 300,000 cubic yards of sediment accumulated here over a period of <br />years and eventually must be pumped by dredge into the river channel below the dam gate <br />for transportation to the Laguna Basin; probably some time in the next 2 to 3 years. This <br />channel is approximately 360 feet wide by 1500 feet long and is dug to an average depth of <br />15 feet for a total of 300,000 cubic yards of sediment. Working a two-shift schedule it <br />would take 4 months to clean the channel. <br /> <br />Laguna Division <br /> <br />The Laguna Division includes the area between Imperial and Laguna Dams. The Laguna <br />Division receives the ~ediment returned from the All-American Canal Desilting Works. <br />Because this created problems associated with Mexican diversions at Morelos Dam, in the <br />mid 196Os, Reclamation constructed a settling basin in the Laguna Division where sediment <br />from upstream sources is trapped and pumped with a dredge for disposal onto dry land. <br /> <br />Appendix C - 8 <br />