My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11561
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD11561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:21:57 AM
Creation date
2/11/2008 3:16:00 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
600
County
El Paso
Community
El Paso County and Unincorporated Areas
Stream Name
Sand Creek East Fork
Basin
Arkansas
Title
LOMR - Affected Panel 756F - Case No. 05-08-A578P
Date
10/30/2006
Prepared For
El Paso County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHANGES ARE MADE IN DETERMINATIONS OF BASE FLOOD ELEVATIONS FOR THE <br />UNINCORPORATED AREAS OF EL PASO COUNTY, COLORADO, UNDER THE NATIONAL <br />FLOOD INSURANCE PROGRAM <br /> <br />On March 7, 1997, the Department of Homeland Security's Federal Emergency Management Agency <br />identified Special Flood Hazard Areas (SFHAs) in the unincorporated areas ofEI Paso County, Colorado, <br />through issuance of a Flood Insurance Rate Map (FIRM). The Mitigation Division has determined that <br />modification of the elevations of the flood having a I-percent chance of being equaled or exceeded in any <br />given year (base flood) for certain locations in this community is appropriate. The modified Base Flood <br />Elevations (BFEs) revise the FIRM for the community. <br /> <br />The changes are being made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (public <br />Law 93-234) and are in accordance with the National Flood Insurance Act of 1968, as amended <br />(Title XIII of the Housing and Urban Development Act of 1968, Public Law 90-448), 42 U.S.c. <br />4001-4128, and 44 CFR Part 65. <br /> <br />A hydraulic analysis was performed to incorporate new topographic information and the effects of a <br />channel-modification project along Sand Creek East Fork from approximately 3,020 feet to <br />approximately 100 feet upstream of Marksheffel Road. This has resulted in a revised delineation of the <br />regulatory floodway, increases and decreases in SFHA width, and increased and decreased BFEs for Sand <br />Creek East Fork. The aforementioned channelized portion of Sand Creek East Fork contains the base <br />flood. The table below indicates existing and modified BFEs for selected locations along the affected <br />lengths of the flooding source(s) cited above. <br /> <br />Location <br /> <br />Existing BFE <br />(feet) * <br /> <br />Modified BFE <br />(feet) * <br /> <br />Approximately 200 feet upstream of Marksheffel Road <br />Approximately 2,700 feet upstream of Marksheffel Road <br /> <br />6,385 <br />6,414 <br /> <br />6,384 <br />6,415 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation Division must develop criteria for <br />floodplain management. To participate in the National Flood Insurance Program (NFIP), the community <br />must use th(~ modified BFEs to administer the floodplain management measures of the NFIP. These <br />modified BFEs will also be used to calculate the appropriate flood insurance premium rates for new <br />buildings and their contents and for the second layer of insurance on existing buildings and contents. <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days in <br />which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br />Division reconsider the determination. Any request for reconsideration must be based on knowledge of <br />changed conditions or new scientific or technical data. All interested parties are on notice that until the <br />90-day period elapses, the Mitigation Division's determination to modify the BFEs may itself be changed. <br /> <br />Any person having knowledge or wishing to comment on these changes should immediately notify: <br /> <br />The Honorable Jim Bensberg <br />Chairman, EI Paso County <br />Board of Commissioners <br />27 East Vermijo Avenue <br />Colorado Springs, CO 80903-2208 <br />
The URL can be used to link to this page
Your browser does not support the video tag.