My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Secretary of the Interior - Washington - CO River Interim Guidelines for Lower Basin Shortages and the Coordinated Operations for Lake Powell and Lake Mead
CWCB
>
Publications
>
DayForward
>
The Secretary of the Interior - Washington - CO River Interim Guidelines for Lower Basin Shortages and the Coordinated Operations for Lake Powell and Lake Mead
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2010 8:58:19 AM
Creation date
2/4/2008 1:09:43 PM
Metadata
Fields
Template:
Publications
Year
2007
Title
The Secretary of the Interior - Washington - CO River Interim Guidelines for Lower Basin Shortages and the Coordinated Operations for Lake Powell and Lake Mead
CWCB Section
Interstate & Federal
Description
The Secretary of the Interior - Washington - CO River Interim Guidelines for Lower Basin Shortages and the Coordinated Operations for Lake Powell and Lake Mead
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Interim Guidelines for the <br />Operation of Lake Powell <br />and Lake Mead <br />Section 3. Implementation of Intentionally Created Surplus <br />[Content of 2001 ISG Section 3., Implementation of Guidelines, is now found at Section <br />7., as modified herein.] <br />A. Categories of ICS <br />1. Extraordinary Conservation ICS <br />A Contractor may create Extraordinary Conservation ICS through the following <br />activities <br />a. Fallowing of land that currently is, historically was, and otherwise would <br />have been irrigated in the next Year. <br />b. Canal lining programs. <br />c. Desalination programs in which the desalinated water is used in lieu of <br />Mainstream water. <br />d. Extraordinary conservation programs that existed on January 1, 2006. <br />e. Extraordinary Conservation ICS demonstration programs pursuant to a letter <br />agreement entered into between Reclamation and the Contractor prior to the <br />effective date of these Guidelines. <br />f. Tributary Conservation ICS created under Section ~.A.2. and not delivered <br />in the Year created. <br />g. Imported ICS created under Section 3.A.4. and not delivered in the Year <br />created. <br />h. Other extraordinary conservation measures, including but not limited to, <br />development and acquisition of anon-Colorado River System water supply <br />used in lieu of Mainstream water within the same state, in consultation with <br />the Basin States. <br />2. Tributary Conservation ICS <br />A Contractor may create Tributary Conservation ICS by purchasing documented <br />water rights on Colorado River System tributaries within the Contractor's state if <br />there is documentation that the water rights have been used for a significant period <br />of Years and that the water rights were perfected prior to June 25, 1929 (the <br />effective date of the Boulder Canyon Project Act). The actual amount of any <br />Tributary Conservation ICS introduced to the Mainstream shall be subject to <br />verification by the Secretary as provided in Section 3.D. Any Tributary <br />December 2007 ROD -Colorado River Interim Guidelines for <br />38 Lower Basin Shortages and Coordinated <br />Operations for Lake Powell and Lake Mead <br />
The URL can be used to link to this page
Your browser does not support the video tag.