My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Basin States' Comments on Draft Environmental Impact Statement, CO River Interim guidelines for Lower Basin Shrotages and Coordinated Operations for Lake Powell and Lake Mead
CWCB
>
Publications
>
DayForward
>
Basin States' Comments on Draft Environmental Impact Statement, CO River Interim guidelines for Lower Basin Shrotages and Coordinated Operations for Lake Powell and Lake Mead
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2010 8:58:15 AM
Creation date
2/4/2008 10:42:58 AM
Metadata
Fields
Template:
Publications
Year
2007
Title
Basin States' Comments on Draft Environmental Impact Statement, CO River Interim guidelines for Lower Basin Shrotages and Coordinated Operations for Lake Powell and Lake Mead
CWCB Section
Interstate & Federal
Description
Basin States' Comments on Draft Environmental Impact Statement, CO River Interim guidelines for Lower Basin Shrotages and Coordinated Operations for Lake Powell and Lake Mead
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. System Efficiency ICS created pursuant to Article 2.3 of this <br />Forbearance Agreement because a large portion of the water saved by <br />this type of project will increase the quantity of water in storage. <br />2. Extraordinary Conservation ICS created by conversion of Tributary <br />Conservation ICS that was not released in the Year created, pursuant <br />to Article 2.1(E) of this Forbearance Agreement, because 5% of the <br />ICS is deducted at the time the Tributary Conservation ICS is created. <br />3. Extraordinary Conservation ICS created by conversion of Imported <br />ICS that was not released in the Year created, pursuant to Article <br />2.1(F) of this Forbearance Agreement, because 5% of the ICS is <br />deducted at the time the Imported ICS is created. <br />D. In addition to the conditions described above, creation of Extraordinary <br />Conservation ICS is subject to the following conditions: <br />1 Except as provided in Articles 2.2 and 2.4, Extraordinary Conservation <br />ICS can only be created if such water would have otherwise been <br />beneficially used. <br />2. The maximum total amount of Extraordinary Conservation ICS that <br />can be created during any Year is limited to the following: <br />a. 400,000 acre-feet for California Contractors; <br />b. 125,000 acre-feet for Nevada Contractors; and <br />c. 100,000 acre-feet for Arizona Contractors. <br />3. The maximum quantity of Extraordinary Conservation ICS that may <br />be accumulated in all IC5 Accounts, at any time, is limited to the <br />following: <br />a. 1,500,000 acre-feet for California Contractors; <br />b. 300,000 acre-feet for Nevada Contractors; and <br />c. 300,000 acre-feet for Arizona Contractors. <br />4. Except as provided in Articles 2.2 and 2.4, no category of surplus <br />water can be used to create Extraordinary Conservation ICS. <br />5. The quantity of Extraordinary Conservation ICS remaining in an <br />ICS Account at the end of each Year shall be diminished by annual <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.