My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12634
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP12634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:47 PM
Creation date
1/18/2008 2:42:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.105.H
Description
Water Projects - Navajo - Operation Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1998
Author
DOI-BOR
Title
Outlet Works Discharge Capacities - Navajo Dam - CRSP - Colorado-New Mexico - Technical Memorandum Number Nav-8130-TM-98-1 - DOI-BOR - 10-01-98
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001G97 <br /> <br />Cap end of ' <br />Cylinder <br />1800 p.s.i. <br /> <br />[:[.. ,,~~ <br />1 V~~.:~ <br />C~1 <br /> <br />Rod end of <br />Cylinder <br />2037 p.s.i. <br /> <br />The ratt9 of drift indicates the condition of the cylinder and the power it can deliver <br />under flJllload. Since the actual differential pressure generated is only 237 p.s.i., very <br />little drift should be measured. . <br /> <br />PROCEDURE <br /> <br />. ~ <br /> <br />L <br />h <br />~ <br /> <br />WARNING -1~t.:::SlI~~:@..f.~;II:!!I:I~I!::i1[i~il.~;~t($.t.~Ii;Ii.'ii;1I.Q..~I!Bii <br />i@iI1Iiilli~ilt~~~a~~lyl:liiiRri~gtg;i,-gi. <br /> <br />CAUTION - Disengage ring-follower hanger <br /> <br />H in NEUTRAL, E and F are CLOSED. <br /> <br />OPEN E~ and D to test ring-follower #1. <br /> <br />OPEN ring follower #1 by shifting G to OPEN until fully opened. <br /> <br />Begin ciosing the ring-follower by shifting G to CLOSE. <br /> <br />CLOSE D. Immediately mark shaft and measure length and time of drift. <br /> <br />NOTE: ~f results are erratic, check TRV4, J1, V1 and rod packing for leaks. <br /> <br />Repeat test every six inches of rod movement. CLOSE Band D. Hang gate if left <br />open. <br /> <br />Bll <br />Ii <br />~ <br /> <br />WARNING - Re-verify RV1 accurately to 1800 p.s.i. with a dead weight tested gage <br /> <br />CAUTION - Disengage ring-follower hanger <br /> <br />H in NEUTRAL, E and F are CLOSED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.