My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00154
CWCB
>
Publications
>
DayForward
>
PUB00154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2011 11:22:42 AM
Creation date
1/18/2008 12:52:00 PM
Metadata
Fields
Template:
Publications
Year
1992
Title
Agenda Item 6 January 22-23 1992 Board Meeting
CWCB Section
Administration
Description
Agenda Item 6 January 22-23 1992 Board Meeting
Publications - Doc Type
Tech Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUMMARY OF SALVAGED AND SAVED WATER <br />POTENTIALLY AVAILABLE FROM UINTAH AND <br />PRICE-SAN RAFAEL SALINITY CONTROL PROJECTS <br /> <br />Irrigation Efficiency .Saved. Water Saved Water Salvaged Water Reduction in Cons. Salvage Reduction change in River <br />Improvement Levels Reduction in Annual Cost Use ,11 Annual Cost Return Flow below <br /> Diversions Flow <br /> headgate return <br /> flow entrY <br /> AF ,11 $/AF/vr iI Crop c.u. Incid.c.u. Net c.u. ,11 $/AF/vr iI AF AF <br />UINTAB BASIN <br />eas. II Improved - 11 <br />Case I Existina Svstem 6,310 8\ $100 <6,820> 420 -- --- 12,710 + 6,310 -6,400 <br />Case III Improved (no <br />additional crop cons. use) - <br />Caee I 18,190 24\ $ 35 0 2,005 2,005 3\ $325 16,185 +18,190 +2,005 <br />PRICE SAN RAFAEL <br />Cas. II Improved - ~I <br />Case I Existing System 0 - -- <24,688> <621> -- --- 25,309 0 -25,309 <br />Case III Improved (no <br />additional crop cons. use) - - <br />Case I 48,350 27\ $125 0 10,038 10,038 6\ $595 38,312 +48,350 +10,038 <br /> <br />~/ Percent of pre-improvement diversion levels: Uintah at 74,960 AF/yr, Price-San Rafael at 178,100 AF/yr <br /> <br />~/ Annual Project Costs from USDA/USBR Planning Documents <br />Uintah Basin Construction Cost - $6.74 million, Annual Cost = $652,000 <br />Price-San Rafael Construction Cost = $72.14 million, Annual Cost = $5,986,000 <br /> <br />1/ Consumptive Use Increases because area has a current shortfall in irrigation water availability, no salvage results. <br /> <br />BJSALVAGE2.TAB <br /> <br />"3 <br />III <br />0- <br />,... <br />(l) <br /> <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.