My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00153
CWCB
>
Publications
>
DayForward
>
PUB00153
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2011 11:22:29 AM
Creation date
1/18/2008 12:48:38 PM
Metadata
Fields
Template:
Publications
Year
1994
Title
Background and Analysis of Apportioned Revenue Colorado River Storage Project
CWCB Section
Administration
Description
Background and Analysis of Apportioned Revenue Colorado River Storage Project
Publications - Doc Type
Legal Analysis
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />NOV-1S-94 FR:I 16:03 B. o. R. UC REG:ION <br /> <br />P.04 <br /> <br />BACKGROUND AND ANALYSIS OP APPORTIONED REVENUE <br />COLORADO RIVER STORAGE PROJECT <br /> <br />Legislative Back9roun~ <br /> <br />The Colorado River Storage Project (CRSP), authorized on April 11, <br />1956 (Public Law 84-485), is a program to develop, and make available <br />for use, the water resources of the Upper Colorado River Basin. CRSP <br />is composed of four multipurpose storage units, Flaming Gorge, Wayne <br />N. Aspinall, Navajo and Glen Canyon, usually referred to as the <br />mainstem, and 25 authorized participating projects in the states of <br />Colorado, New Mexico, Utah and wyoming. <br /> <br />Section 5 of the CRSP Act authorized a separate fund in the Treasury <br />of the United States to be known as the Upper Colorado River Basin <br />Fund (Basin Pund). Since 1963, all revenue in the Basin Fund <br />collected, in connection with operation of CRSP mainstem facilities in <br />excess of operating needs, has been paid annually to the general fund <br />of the Treasury to return CRSP investment costs allocated to: (1) <br />power, (2) municipal water supply, (3) interest thereon, (4) <br />irrigation water supply, and (5) salinity investment and operation <br />costs assigned to the Upper Basin Fund subsequent to enactment of the <br />Colorado River Salinity Control Act of June 24, 1974 (Public Law 93. <br />320) . <br /> <br />Pursuant to Section 5{e) of the CRSP Act, revenues from the mainstem <br />units in excess of the above-mentioned expenditures are then <br />apportioned to each of the Upper Basin States to help defray <br />investment costs allocated to irrigation purposes of the participating <br />projects within each state. Only revenues from the mainstem units are <br />apportioned under Section S{e). Revenues from each participating <br />project are used to defray the investment costs of that specific <br />project. <br /> <br />Financial Links Within the Basin Fund <br /> <br />Through Section 5(e) of the CRSP Act, mainstem units and the <br />participating projects are "linked" financially. The revenues <br />produced from the mainstem units in the form of hydroelectric power <br />sales, and to a lesser extent water service sales, assist to repay <br />investment costs of the participating projects allocated to irrigation <br />purposes and determined to be beyond the irrigators' ability to pay. <br />This use of revenues generated from the mainstem units to supported <br />the repayment of participating project ir~igation costs is referred to <br />as mainstem assistance. <br /> <br />The Act specifically itemizes the apportionment of the excess revenue <br />in the formula of; 46.0 percent to Colorado, 21.5 percent to Utah, <br />15.5 percent to Wyoming and 17.0 percent to New Mexico. Additionally, <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.