Laserfiche WebLink
<br /> <br />APPENDIX A _ FEASIBILITY PHASE COST ESTIMATE. ***Currently Under <br />Revision. <br /> <br /> <br /> REVISED FEASIBILITY PHASE COST ESTIMATE <br /> CHATFIELD, CHERRY CREEK AND BEAR CREEK, COLORADO <br /> STORAGE REALLOCATION STUDY <br /> 15-Dec-06 <br /> TASK FEDERAL COLORADO <br />TASK DESCRIPTION COSTS CASH IN- <br /> KIND <br /> ($) ($) ($) ($) <br /> HYDROLOGIC STUDIES <br /> Corps Hydrologic study costs - 382,750 254,000 128,750 <br /> Modeling, evaluations, reports, <br /> document reviews <br /> Antecedent Flood Condition Study 156,200 31,200 125,000 <br /> Contract Hydrologic Costs - Modeling 115,037 89,384 25,653 <br /> i(Simon & Assoc) <br /> Sub Total <br /> HYDRAULIC STUDIES <br /> Corps Hydraulic study costs - reports, 225,006 166,190 58,816 <br /> document reviews <br /> Contract Hydraulic study costs (Simon 379,202 294,640 84,562 <br /> & Assoc.) <br />1.1 Aerial photography between Adams-Weld and CO-NE line 120,000 <br />1.2 Forward HEC-2 models, stivey files, andsurveyed cross sections. 1,752 <br />1.3 Cost for 1997 AutoCad surveys and 1997 HEC-2 50,000 <br /> model <br />5 Obtain bridge plans between Adams-Weld to CO- 2,336 <br /> NE line <br /> SubTotal 174,088 <br /> DOWNSTREAM DAMAGES <br /> Contract Discharge Damages Analysis 54,677 21,871 32,806 <br /> I 'Tetra Tech) , <br /> Contract Discharge Damages Analysis 17,200 13,364 3,836 <br /> ,(Simon & Assoc.) <br /> <br />1 <br />