Laserfiche WebLink
Castle Rock Synthetic Turf Project <br />Application for Water Efficiency Grant <br />^ More consistent playable hours -Synthetic turf doesn't wear like irrigated turf; <br />therefore, it doesn't require service interruptions to repair damage and allow for <br />recovery. <br />^ Reduced annual maintenance -Synthetic turf only requires periodic cleaning of the <br />drainage system and brooming of the field following use. <br />^ Water savings -Synthetic turf doesn't require irrigation and hence provides water <br />savings. <br />3.3 Conservation Plan and Water Savings <br />The proposed project would reduce Castle Rock's overall irrigation needs and is <br />thereby expected to provide water savings of up to 1.5 million gallons per years which <br />is equivalent to the average amount of water used by approximately nine homes in <br />one years. This would assist Castle Rock in meeting its conservation goal to reduce <br />current and future water demands particularly in areas such as landscaping and <br />targeted water savings objectives of 18 percent over a 5-year average use (165 to 135 <br />gpcd) as outlined in Castle Rock's Water Conservation Plan. Additionally, Castle <br />Rock's conservation goals call for creating a community culture that includes water <br />conservation. Installation of synthetic turf fields is a public display of Castle Rock's <br />commitment to creating community awareness about conservation by making <br />conservation a direct aspect of planning and development. <br />4.0 Scope of Work <br />This scope of work provides a general description of the Synthetic Turf Project at <br />Elementary School #45 and outlines the major tasks, roles, and responsibilities of each <br />party involved and the deliverables. The anticipated schedule and project budget for <br />each of these tasks is provided in Section 5.0 and 6.0, respectively. <br />4.1 Project Overview and Partnership <br />As previously mentioned, Castle Rock and DCSD plan to install a synthetic turf <br />athletic field at the new Elementary School #45 in the Meadows area of Castle Rock. <br />The Synthetic Turf Project will include a 200-foot softball field and a 180-foot by <br />300-foot multiuse field that together cover approximately 1.7 acres. <br />This assumes an average irrigation application rate of 33 inches/year. This application rate <br />was multiplied by the synthetic turf field area (1.7 acres) to obtain a water savings of 1.5 <br />million gallows per year (4.5 AFY). <br />s This assumes that each home uses approximately 0.5 AFY. <br />11 <br />