My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12 (3)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
12 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:34:38 PM
Creation date
1/17/2008 4:34:38 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/22/2008
Description
CF Section - Changes to Existing Loans - Beaver Reservoir Company - Beaver Reservoir Rehabilitation Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Staff Recommendation <br />Staff recommends a loan not to exceed $510,035 ($504,985 for project costs and $5,050 for the 1% <br />Loan Service Fee) to the Beaver Reservoir Company for engineering and construction costs <br />associated with the Beaver Reservoir Rehabilitation Project, from the Severance Tax Trust Fund <br />Perpetual Base Account. The terms shall be based on their previous agricultural rate of 2.5% per <br />annum for 30-years. Final approval of the loan shall be conditioned upon all standard contracting <br />provisions of the CWCB Loan Program. Security for the loan shall be collateral in compliance with <br />CWCB Loan Policy #5. <br />cc: Tom Gillespie, President - Bea~•er Reservoir Company <br />Vaughn McWilliams, CWCB <br />.4my Stengel, AGO <br />
The URL can be used to link to this page
Your browser does not support the video tag.