My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11e
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
11e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:34:36 PM
Creation date
1/17/2008 4:32:52 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/22/2008
Description
CF Section – Construction Fund and Severance Tax Trust Fund Perpetual Base Account – New Loans - Bijou Irrigation District - Empire Reservoir East Embankment Dam Repair
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />Fax: (303) 866-4474 <br />wuu-. c~vcb. state. co. us <br />TO: Colorado Water Conservation Board Members <br />FROM: Anna Mauss, P.E. <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />DATE: January 14, 2008 <br />Bill Ritter, Jr <br />Governor <br />Harris D. Sherman <br />DNR Executive Director <br />Jennifer L. Gimbel <br />cwcB Director <br />Dan McAuliffe <br />CWCB Deputy Director <br />SUBJECT: Agenda Item lle, January 22-23, 2008 Board Meeting <br />Water Supply Planning and Finance Section - Ne~v Project Loans <br />Bijou L•rigation District -Empire Res. East Embankment Dam Repair <br />Introduction <br />The Bijou Irrigation District (District) is applying fora $2,385,000 loan from the CWCB to <br />rehabilitate the Empire Reservoir along the east embankment of the dam where significant wave <br />erosion caused damage. Because of this damage, the dam was put on a fill restriction to a gauge <br />height (GH) of 29.0 feet. The estimated total cost of the project is $2,650,000. See the attached <br />Project Data Sheet for a location map and project summary. <br />Background <br />The District owns and operates Empire Reservoir located west of Fort Morgan in Weld and <br />Morgan Counties, between I-76 on the south and US Highway 34 on the north. The District <br />provides irrigation water to a 19,200-acre service area in Morgan County, located between the <br />reservoir and the City of Fort Morgan. The District is a taxing district that levies a tax per acre <br />based on benefits received, not an ad valor•e~n property tax. The irrigation water is primarily <br />used to grow corn (approx. 70%) and hay (approx 20%). Water stored in the reservoir is <br />delivered to users through a sister company, Bijou Irrigation Company (Company), which <br />operates and maintains the distribution system, used for either direct irrigation or exchanges. <br />The Company has direct flow rights at the Bijou Canal diversion on the South Platte, and <br />maintains about 90 miles of ditch, Bijou No. 2 Reservoir, and some augmentation ponds. <br />Empire Reservoir is used to supplement the direct flows, typically in April through September. <br />Annual delivery from the reservoir is about 19,900 acre-feet. The proposed loan for Empire <br />Reservoir is to the District and does not involve the Company. <br />Water Supply Protection • Watershed Protection & Flood bTitigation • Stream & Lake Protection • Water Supply Planning & Finance <br />Water Conservation & Drought Planning • Intrastate Water Management & Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.