Laserfiche WebLink
<br />~ <br />f=r-r~) SCHMUESER I GORDON I MEYER <br />~~). ENGINEERS 6.. SURVEYORS <br />,,'""-"'" <br /> <br />Research in savings from other municipalities, potentia) savings fr0I11 high-use customers, and <br />identification of water delTIand reduction targets that could result in significant, meaningful <br />delays in infrastructure costs is still in progress. A key goal for the City, based on <br />reduction/defennent of future water system infrastructure costs, will be reducing peak irrigation <br />demand. Approxirnat.ely 75% of the potable system's treatment and pumping capacity is to <br />produce and deliver water for outdoor use. We anticipate that a quantitative goal may be <br />deveJoped for peak day use reduction as opposed to overall annual use reduction. <br /> <br />Task 03: Identify Conservation Measures and Programs (Planning Step #5) <br /> <br />Scheduled comoletion: <br />Estimated completion to date: <br /> <br />Nov. 9,2007 <br />95% <br /> <br />A comprehensive list of applicable programs & measures was created through researching other <br />plans,. A WWA documents and several other resources. Tins list was then refined to fit the unique <br />circumstances for the City of Rifle through brainstorlning with City staff and stakeholders. <br /> <br />The measures that have been prioritized to date include increasing the existing tiered-rate <br />structure; improve system wide accounting and leak management; implementing design standards <br />for new landscapes; creation of an infornlational water conservation website; and retrofitting <br />existing pluIllbing fixtures~ landscapes and irrigation systems for city-owned facilities. <br /> <br />Task 04: Evaluate Conservation Measures and Programs (planning Step #6) <br />Scheduled completion: <br />Scheduled submission of 500/0 review: <br />Estim_ated completion to date: <br /> <br />Dec. 7 ~ 2007 <br />Dec. I, 2007 <br />250;0 <br /> <br />From the refined list created fOf Task 3, a spreadsheet has been developed to score each measure <br />based on established priorities including water savings potential and a cost/benefit analysis for <br />infrastructure and 0 & M costs. It is clear at this point that the most promising measures involve <br />the City's water treatment systelTI and its rate structure. <br /> <br />Further defining each prograJn/lneasure; identifying how they will be implemented; and assigning <br />planning-level costs per gallon saved estimates to each of the programs/measures still needs to be <br />completed. <br /> <br />Task 05: Integrate .Resources, Modify Forecasts, and Select Measures and Programs (Planning <br />Step #7) <br /> <br />Scheduled completion: <br />Estimated comoletion to date: <br /> <br />Dec. 21 , 2007 <br />00/0 <br /> <br />Task 06: Develop Conservation Program Implementation Plan (plan Step #8) <br /> <br />Scheduled completion: <br />Estimated completion to date: <br /> <br />Jan.25~2008 <br />0% <br /> <br />SGM # 99055A-38g <br /> <br />Progress Report - 50% <br />