Laserfiche WebLink
Section 5 <br />Addressing the Water Supply Gap Technical Roundtable <br />100% <br />~ 90% <br />~ 80% <br />0 <br />~ 70% <br />~ 60% <br />a~ <br />~ 50% <br />a~ <br />L <br />~ 40% <br />0 30% <br />v 20% <br />L <br />a 10% <br />0% <br />450,000 <br />400,000 <br />350,000 <br />300,000 <br />v 250,000 <br />v <br />LL <br />U! <br />U <br />a 200,000 <br />150,000 <br />100,000 <br />50,000 <br />0 <br />FINAL DRAFT 5-7 <br />0% 25% 50% <br />Figure 5-5 <br />Uncertainty in Identified Projects Et Processes <br />Figure 5-6 <br />Water Supply Gap and Firm Yield from Projects in NEPA Process in the South <br />Platte Basin <br />