My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section5_Gap_11-7-07
CWCB
>
SWSI II Technical Roundtables
>
DayForward
>
Section5_Gap_11-7-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 10:29:57 AM
Creation date
1/10/2008 2:08:21 PM
Metadata
Fields
Template:
SWSI II Technical Roundtables
Title
SWSI Phase 2 Report - Section 5 Addressing the Water Supply Gap Technical Roundtable
Date
11/7/2007
Author
CWCB
SWSI II - Doc Type
Final Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 5 <br />Addressing the Water Supply Gap Technical Roundtable <br />Gunni n Bain <br />Growth in the Upper C <br />and Upper Uncompah <br />Uncompahgre Valley a <br />~ Agriculture, tourism, a <br />nnison and North Fork <br />headwaters and <br />challenges. <br />is recreation are <br />to this basin's economy. <br />~ There is concern over possible future transbasin <br />diversions and the effect this might have on the <br />basin's future. <br />~ Resolving federal issues (reserved water rights <br />and endangered species) is a priority. <br />~ Addressing agricultural water shortages in the <br />upper portion of the basin is a goal; lack of <br />financial resources is an impediment. <br />FINAL DRAFT 5-11 <br />Figure 5-10 <br />Summary of Gap Analysis for Gunnison Basin <br />
The URL can be used to link to this page
Your browser does not support the video tag.