My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section1_Introduction
CWCB
>
SWSI II Technical Roundtables
>
DayForward
>
Section1_Introduction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 10:29:49 AM
Creation date
1/10/2008 1:33:13 PM
Metadata
Fields
Template:
SWSI II Technical Roundtables
Title
SWSI Phase 2 Report - Section 1 Introduction
Date
11/7/2007
Author
CWCB
SWSI II - Doc Type
Final Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 1 <br />Introduction <br />8,000,000 <br />~,ooo,ooo <br />s,ooo,ooo <br />0 <br />3 5,000,000 <br />0 <br />~ 4,000,000 <br />a~'i 3,000,000 <br />2,000,000 <br />1,000,000 <br />implementable objectives that can be met <br />over a longer term. Based on information <br />obtained during SWSI, it is now known <br />that Colorado can potentially meet <br />80 percent of its municipal and industrial <br />water needs by 2030; however, some <br />water suppliers may need help building <br />infrastructure, mitigating and permitting <br />projects, enhancing and improving the <br />environment, and conse>IVing water. <br />1.3 Meeting 80 Percent of <br />the Municipal &t Industrial <br />(M&tl) Need <br />SWSI has catalogued the specific projects, <br />plans, and processes that local water <br />suppliers have identified and are <br />undertaking as components of their own <br />water supply planning efforts to meet the <br />needs they themselves have identified. As a <br />whole, if these projects are implemented, <br />80 percent of the state's 2030 M~SCI water <br />needs can be met. This is the most <br />optimistic scenario. But there is uncertainty <br />Source: Colorado Department of Local Affairs Demography Section and hurdles to Overcome. <br />Figure 1-1 <br />Population Projections by Basin <br />Consequently, the mission of the state with <br />1.2 The Path Forward respect to meeting 80 percent of Colorado's <br />M~eI water needs by 2030 should be: <br />While the CWCB was directed to complete SWSI <br />and deliver its findings and recommendations to the <br />General Assembly in 18 months, implementing SWSI <br />will take years and decades. Helping ensure <br />Colorado's water future is a complex and difficult <br />challenge. Addressing Colorado's water supply future <br />means that the social, economic, and cultural health <br />and integrity of all of its river basins must be <br />protected This is a daunting challenge and it will <br />require creative solutions, dedication, and <br />persistence. <br />Following the lead of local water suppliers, the <br />state will monitor long-term water needs, provide <br />technical and financial assistance to put the <br />necessary plans, projects, and programs in place <br />to meet those needs, and foster cooperation to <br />avoid being forced to make trade-offs that would <br />otherwise harm Colorado's environment, lifestyle, <br />culture, and economy. <br />Following completion of the first phase of SWSI, the <br />CWCB adopted several goals and objectives that can <br />be accomplished with the help of Colorado's water <br />providers, water users, elected officials, and citizens. <br />These goals will be met by developing sound <br />1-2 FINAL DRAFT <br />2000 2010 2020 2030 <br />
The URL can be used to link to this page
Your browser does not support the video tag.