My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
S11_11-15-04
CWCB
>
SWSI
>
DayForward
>
S11_11-15-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2010 9:24:17 AM
Creation date
1/10/2008 1:16:37 PM
Metadata
Fields
Template:
SWSI
Basin
Statewide
Title
SWSI Phase 1 Report - Section 11 Implementation
Date
11/15/2004
Author
CWCB
SWSI - Doc Type
Final Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 11 <br />Implementation <br />^ Work with the Colorado Foundation for Water <br />Education to determine how to convey the information <br />gathered during SWSI. <br />^ Analyze and, with Board approval, promote specific <br />conjunctive use projects utilizing surface water and <br />groundwater resources. <br />^ Develop water availability and sustainability estimates <br />for non-tributary groundwater areas, particularly the <br />Denver Basin and Northern and Southern High <br />Plains. <br />^ Identify and exploit federal funding opportunities. <br />11.7 Next Phases of SWSI <br />Building on the foundation laid by this first phase of <br />SWSI, SWSI will continue with at least two meetings <br />scheduled for most basins between November 2004 and <br />July 2006. The subject of future Basin Roundtable <br />Technical Meetings is expected to be as follows: <br />^ Continue to refine technical data and demands on a <br />statewide level. <br />^ Assess supply availability on a statewide basis. <br />^ Determine risk associated with uncertainty in the <br />implementation of the Identified Projects and <br />Processes. <br />^ Identify key Identified Projects and Processes and <br />develop a monitoring mechanism to track the <br />progress of Identified Projects and Processes. <br />^ Develop basin-specific alternatives using options for <br />20 percent M&I gap, agricultural, recreational, and <br />environmental needs, and uncertainty associated with <br />the Identified Projects and Processes. <br />^ Assess the ability of existing funding programs to <br />meet Colorado's water needs, begin to develop a <br />framework for new programs if a need is identified, <br />and develop basin-specific implementation and <br />funding plans. <br />~~ <br />^ Develop water supply and water use reporting <br />mechanisms and work with water users to develop <br />consensus; identify levels of conservation and work <br />with the Colorado Municipal League to facilitate this <br />process. <br />^ Facilitate the creation of partnerships between water <br />suppliers and state and federal agencies. <br />In addition, the next phase of SWSI should include more <br />emphasis on the identification of solutions involving <br />multiple basins. In support of this, CWCB should <br />schedule meetings of multiple basins where solutions for <br />water supply involve more than one basin. <br />11.8 Opening <br />A report such as this usually has a conclusion. However, <br />the entire report is the conclusion - we know how much <br />water we need and how much water can be provided if <br />current plans and processes are implemented. <br />Therefore, what has truly been provided is an ~pening. <br />. __~ - ~ .. . ~ ~ :. ,:~_ , , ~-,;,~=- <br />~~ <br />Statew~itle Water Supply Inii'iative <br />11-14 S:\REPORT\WORD PROCESSING\REPORT\S11 11-10-04.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.