My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
S6_11-15-04
CWCB
>
SWSI
>
DayForward
>
S6_11-15-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2010 9:24:17 AM
Creation date
1/10/2008 11:00:07 AM
Metadata
Fields
Template:
SWSI
Basin
Statewide
Title
SWSI Phase 1 Report - Section 6 Water Needs Assessment
Date
11/15/2004
Author
CWCB
SWSI - Doc Type
Final Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 6 <br />Water Needs Assessment <br />Table 6-8 Detailed Identified Proiects and Processes for Colorado Basin <br />. <br />, . <br />Pitkin (cont.) Snowmass 0 U Have adequate water rights. Would like John Gurrier <br />Village additional flows for environmental and <br /> recreational purposes. Snowmass Creek in <br /> stream flow right an issue and may require <br /> storage upstream of the instream flow. <br /> Unincorporated 0 U Can purchase augmentation credits through John Currier <br /> Pitkin County Basalt WCD. May need small onsite storage <br /> to replace depletions to local water rights. <br />Summit Breckenridge 0 Y Existing water rights and UPCO process UPCO Study <br /> assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> Dillon 0 N Existing water rights and UPCO process CDM survey response <br /> assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> Silverthorne 0 U Existing water rights and UPCO process UPCO Study <br /> assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> Frisco 0 U Existing water rights and UPCO process UPCO Study <br /> assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> Blue River 0 N Existing water rights and UPCO process UPCO Study <br /> assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> Copper 0 N Existing water rights and UPCO process UPCO Study <br /> Mountain assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> Keystone area 0 N Existing water rights and UPCO process UPCO Study <br /> assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> A Basin 0 U Existing water rights and UPCO process UPCO Study <br /> assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br />t~ <br />6-32 S:\REPORIIWORD PROCESSING\REPORllS6 11-8-04.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.