My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
S6_11-15-04
CWCB
>
SWSI
>
DayForward
>
S6_11-15-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2010 9:24:17 AM
Creation date
1/10/2008 11:00:07 AM
Metadata
Fields
Template:
SWSI
Basin
Statewide
Title
SWSI Phase 1 Report - Section 6 Water Needs Assessment
Date
11/15/2004
Author
CWCB
SWSI - Doc Type
Final Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 6 <br />Water Needs Assessment <br />Table 6-8 Detailed Identified Proiects and Processes for Colorado Basin <br />. <br />, . <br />Garfield Battlement Mesa 0 Y Have adequate water rights for buildout - John Gurrier <br />(cont.) senior water rights and Ruedi contracts <br /> Carbondale 0 U Have alluvial Roaring Fork alluvial wells John Currier <br /> requiring augmentation. Can use existing, <br /> unused Ruedi Contracts for future <br /> augmentation. <br /> Glenwood 0 U Existing water rights and unused Ruedi John Currier <br /> Springs Contracts, if needed. <br /> New Castle 0 U Recently constructed an intake from the John Currier <br /> Colorado River. New developments must <br /> bring water - usually Ruedi contracts or <br /> agricultural dry-up. <br /> Other Garfield 300 N Some areas will purchase water from Basalt John Currier <br /> County and and West Divide Water Conservancy <br /> unincorporated Districts, to the extent available. Other areas <br /> areas will need to dry-up agriculture and develop <br /> storage. <br /> Parachute 0 U Should be able to use Ruedi contracts. John Currier <br /> Rifle 0 U Have Ruedi contracts. Michael Erion, Resource <br /> Consultants <br /> Silt 0 U Developers are required to bring water for John Currier <br /> new development. Any remaining gap <br /> should be able to be satisfied by Ruedi <br /> contracts. <br />Grand Columbine Lake 0 U Existing water rights and UPCO process UPCO Study <br /> Water District assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> Fraser 159 N Existing water rights and UPCO process UPCO Study <br /> assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> Granby 5 N Existing water rights and UPCO process UPCO Study <br /> assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> Grand Couniy 497 N Existing water rights and UPCO process UPCO Study <br /> Water and assumed to provide for future demands. <br /> Sanitation There may be a gap if the UPCO process <br /> does not result in new supplies. <br /> Grand Lake 0 U Existing water rights and UPCO process UPCO Study <br /> assumed to provide for future demands. <br /> There may be a gap if the UPCO process <br /> does not result in new supplies. <br />t~ <br />6-30 S:\REPORIIWORD PROCESSING\REPORllS6 11-8-04.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.