My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
S6_11-15-04
CWCB
>
SWSI
>
DayForward
>
S6_11-15-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2010 9:24:17 AM
Creation date
1/10/2008 11:00:07 AM
Metadata
Fields
Template:
SWSI
Basin
Statewide
Title
SWSI Phase 1 Report - Section 6 Water Needs Assessment
Date
11/15/2004
Author
CWCB
SWSI - Doc Type
Final Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 6 <br />Water Needs Assessment <br />Table 6-4 Detailed Identified Proiects and Processes forthe Arkansas Basin <br />. <br />. <br />. .. <br />v <br />J <br />Crowley Crowley County 100 N Arkansas Valley Pipeline would Arkansas Valley Pipeline Study, <br />(cont.) Water System improve water qualiiy and reduce Arkansas Basin Roundtable <br /> including towns of transit losses. PSOP could provide feedback, and Matt Heimerich, <br /> Crowley and Ordway firming of Fry-Ark allocation. Potential Crowley County Commissioner <br /> increase in prison population would <br /> result in a gap. State Demographer <br /> population forecast shows minor <br /> increase in o ulation. <br /> Sugar Ciiy 0 N Arkansas Valley Pipeline would Arkansas Valley Pipeline Study, <br /> improve water qualiiy and reduce Arkansas Basin Roundtable <br /> transit losses. There are concerns feedback, and Matt Heimerich, <br /> over future supplies as Fry-Ark may Crowley County Commissioner <br /> be oversubscribed, and return flows <br /> and firm ield less than lanned. <br /> Unincorporated 0 N Arkansas Valley Pipeline would Arkansas Valley Pipeline Study, <br /> Crowley Co. not improve water qualiiy and reduce Arkansas Basin Roundtable <br /> served by a water transit losses. There are concerns feedback, and Matt Heimerich, <br /> system over future supplies as Fry-Ark may Crowley County Commissioner <br /> be oversubscribed, and return flows <br /> and firm ield less than lanned. <br />Custer Round Mountain 150 N Alluvial groundwater. Terry Scanga, UAWCD <br /> Water District <br /> (Towns of Westcliffe <br /> and Silvercli <br /> Unincorporated 200 N Covered by UAWCD when well Terry Scanga, UAWCD <br /> Custer Couniy not in augmentation plan is filed. Some <br /> a water district areas with augmentation will be <br /> difficult due to intermittent streams <br /> and futile calls. Need Twin Lakes <br /> water or agricultural rights since not <br /> in SECWCD. Will need storage plus <br /> ac uisition of water ri hts. <br />EI Paso Colorado Springs 0 Y Colorado Springs has adequate Kevin Lusk, Colorado Springs <br /> Utilities supplies beyond 2030. Member of Utilities <br /> Fountain Valley Authority. Southern <br /> Delivery System (SDS) and PSOP <br /> will firm yield and provide delivery <br /> infrastructure. <br /> Security 0 N Member of Fountain Valley Authoriiy. Gary Thompson, W.W. Wheeler and <br /> Has wells in Widefield aquifer and Associates <br /> currently leasing Colorado Springs <br /> Widefield aquifer water. Will <br /> participate in SDS to replace leased <br /> aquifer water. PSOP could provide <br /> firming of Fry-Ark allocation. Will <br /> purchase agricultural rights along <br /> Fountain Creek as needed. <br /> Fountain 0 N Member of Fountain Valley Authoriiy. Gary Thompson, W.W. Wheeler and <br /> Will participate in SDS. PSOP could Associates <br /> provide firming of Fry-Ark allocation. <br /> Will drill additional alluvial wells and <br /> augment with Fry-Ark and agricultural <br /> dry-up along Fount~in Creek. <br />r~ <br />S:\REPORIIWORD PROCESSING\REPORllS6 11-8-04.DOC 6-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.