My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ArkansasComments21
CWCB
>
SWSI
>
DayForward
>
ArkansasComments21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 10:31:49 AM
Creation date
1/8/2008 12:22:06 PM
Metadata
Fields
Template:
SWSI
Basin
Arkansas
Title
Comments 21
Date
1/19/2004
SWSI - Doc Type
Comments
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />w. <br /> <br />Gilbert, Hanna <br /> <br />From: <br />Sent: <br />To: <br /> <br />BarberGL@aol.com <br />Monday, January 19, 2004 7:28 PM <br />rick.brown@state.co.us; HMiskel@aol.com; DiNatale, Kelly; Morea, Susan; Rehring, John; <br />SWSI (Statewide Water Supply Initiative) <br />Supply Alternatives, Arkansas Basin <br /> <br />Subject: <br /> <br />The EI Paso Cormty Water Authority Master Plan identified some future sources <br />of supply for our members. Figure 10-1 shows the entire state and identifies <br />several alternatives including "Big Straw." Figure 10-2 identifies the <br />Marketable Pool in the Aspinall Unit. Figure 10-4 identifies cooperation in the <br />Southern Delivery System with CSU assuming members purchase their own water <br />rights. When the report was in draft, CSU was posturing that participation would <br />be available to all interested parties. The subsequent requirement to pay <br />150% of cost put more that one interested party off the idea. I am prepared to <br />submit all of these ideas as supply options if you think that is appropriate. <br />Finally, I have been in contact with the owners of approximately 45% of the <br />Ft. Lyon canal company as a possible source of supply for mrmicipal providers <br />who currently depend on non-renewable grormdwater. Likewise, I am prepared to <br />submit that as a supply alternative by your deadline if that meets the criteria <br />you have established. I can meet the deadline of 1/21/04 or I would be glad <br />to talk this over in person next Monday, 1/26/04 at our meeting. Please let <br />me know your thoughts. GB <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.