My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas_SWSI_Update_8-02-04
CWCB
>
SWSI
>
DayForward
>
Arkansas_SWSI_Update_8-02-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 10:31:45 AM
Creation date
1/8/2008 10:38:39 AM
Metadata
Fields
Template:
SWSI
Basin
Arkansas
Title
Arkansas Basin Update
Date
8/2/2004
SWSI - Doc Type
Fact Sheets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Update on Statewide Water Supply Initiative <br />– Arkansas Basin <br />Table 5 Arkansas Subbasins Prelim inary M&I and SSI Demand Analysis <br />Identified <br />2000 2030 Projected Increase Gross Estimated <br />Gross Gross Conservation in Gross Demand CU Demand <br />Demand Demand Savings Demand Shortfall Shortfall <br />(AF) (AF) (AF) (AF) (AF) (AF) <br />Subbasin Designation <br />Upper Arkansas 22,700 36,400 2,400 13,700 5,200 1,500 <br />Urban Counties 212,900 292,800 14,500 79,900 8,000 2,800 <br />Lower Arkansas 12,200 13,000 900 800 1,000 400 <br />Eastern Plains 4,300 5,500 300 1,200 1,400 500 <br />Southwestern Arkansas 4,800 7,200 500 2,400 800 300 <br />TOTAL 256,900 354,900 18,600 98,000 16,400 5,500 <br />Columns and rows may not add up exactly due to rounding <br />Ì¿¾´» ê °®±ª·¼» ¿ ´·¬ ±º ¬¸» ³¿¶±® ·¼»²¬·º· »¼ °®±¶»½¬ ¿²¼ °´¿²²·²¹ »ºº±®¬ ¬¸¿¬ ¿®» <br />«²¼»®©¿§ ±® ¿®» °´¿²²»¼ ·² ¬¸» ß®µ¿²¿ Þ¿· ²ò ׬ ©·´´ ¾» ª»®§ ·³°±®¬¿²¬ ¬¸¿¬ ¬¸»» <br />°®±¶»½¬ ¿²¼ °´¿² ³±ª» º±®©¿®¼ ±® ·¹² ·º·½¿²¬ ¿¼¼·¬·±²¿´ ©¿¬»® «°°´·» ©·´´ ¾» <br />®»¯«·®»¼ò <br />Table 6 Major Identified Projects and Processes to Provide Additional Supply <br />Subbasin Identified Projects and Processes <br />Upper Arkansas Preferred Storage Options Plan (PSOP) <br />Re-operation of the Fryingpan-Arkansas (Fry-Ark) Project <br />Turquoise and Pueblo Reservoir Enlargements <br />10-12% reduction in demand for storage via conservation <br />Augmentation Plans <br />Increased use of Fry Ark M&I allocation <br />Agricultural transfers <br />Urban Counties Active conservation <br />PSOP <br />Maximizing existing water rights <br />Reuse <br />Exchanges <br />Agricultural transfers <br />Southern Delivery System <br />Increased use of Fry-Ark allocation <br />Lower Arkansas Active Conservation <br />PSOP <br />Arkansas Valley Pipeline <br />Exchanges <br />Increased use of Fry-Ark allocation <br />Agricultural transfers <br />Groundwater <br />Eastern Plains Groundwater (non-tributary) <br />Southwestern Arkansas Existing water rights <br />Augmentation Plans <br />Agricultural transfers <br />6 <br />SWSI Update – Arkansas Basin <br />
The URL can be used to link to this page
Your browser does not support the video tag.