Laserfiche WebLink
<br />Gunnison Basin Roundtable Technical Meeting #2 <br />Meeting Summary <br /> <br />. G13 - Upper Gunnison-Uncompahgre Basin Phase 1 - Feasibility Study needs to be examined <br />for potential options. Information will be used. <br />. G14 - Basinwide augmentation plan for agricultural users is a Tier 2 option. <br />. GIS - Plan for augmentation for non-agricultural purposes using Aspinall Unit is a Tier 1 <br />option. <br />. G16 - Improve irrigation systems is a Tier 1 option. <br />. G17 - Uncompahgre Water Users in-system re-regulating reservoirs and supply <br />enhancements is probably a Tier 2 option. <br />. G18 - Project 7 Water Supply Enhancements is probably a Tier 2 option. <br />. G19 - Tri-County Water Conservancy District - Various reservoir sites in Upper <br />Uncompahgre Basin can support "most other uses" beyond M&I a Tier 3. <br />. G20 - Dominguez Reservoir not perceived as having merit. Most RT agreed to retain on list; <br />not unanimous. <br />. Add Orchard Mesa project to the consideration list ("Don Clay" project); look at Gunnison <br />component of the project. <br />. G21 - A/B Lateral is probably a Tier 2 (could be Tier 1) with supplemental EIS underway; <br />suggested for Tier 3 status. <br />. G22 - Lower Gunnison Selenium and Salinity Control is a Tier 1 project. <br />. Cloud seeding proposal should be added to the list. <br />. Site-specific Probable Maximum Precipitation analysis at existing storage sites can result in <br />the ability to store more water without the threat of dam failure/ excess spill and/ or could <br />change spillway design criteria. <br />. Crested Butte reservoir storage concepts in Tier 3 (two Washington Gulch and two East <br />River). <br /> <br />Supply Methodology <br /> <br />Kelly DiNatale presented a brief overview of the methodology to be employed in SWSI for <br />estimating water supplies. The preliminary results of these analyses will be presented at BRT <br />Meeting #3. <br /> <br />Feedback from the BRT members follows. <br /> <br />. Identify codes on dam site inventory with a legend. <br /> <br />Preparation for Basin Roundtable Meeting #3 <br /> <br />. BRT members were reminded of the following deadlines: <br />- Completed objectives weighting forms due back by March 2, 2004 (two weeks). <br />- Additional input on preliminary options list due by March 2, 2004 (two weeks). <br />- Comments on preliminary demand results due by March 2, 2004 (two weeks). <br />. Next BRT meeting will be held Tuesday, April 27, 2004 from 2 ro 8 p.m. in Montrose. <br />. Rick Brown reminded BRT members that they are invited and encouraged to attend other <br />basins' BRTs as may be of interest where there are inter-basin issues. <br /> <br />CDIVI <br /> <br />6 <br /> <br />Gunnison BRT Mtg #2 Summary.doc 4/16/2004 <br />