Laserfiche WebLink
<br /> <br />Table 1 - Summary of Plan Goals and Commitments <br /> <br />The following are obligations to be met by the responsible parties. The details of the <br />commitments are contained in the page reference. All commitments are subject to the <br />principles contained on page 4. <br /> <br /> ~f.. <br />1. No loss of existing or future water su I <br />2. Minimum outflow from Spinney Mountain <br /> Reservoir - 32 cfs or inflow. <br />3. Minimum outflow from Eleven Mile Reservoir __ Denver Water B-8 <br /> 32 cfs or inflow . <br />4. Minimum outflow from Cheesman Reservoir-- Denver Water B-9 <br /> 35 cfs (August-March) and 40 cfs (April-July) or <br /> inflow. <br />5. Ramp outflow changes at Eleven Mile and Denver Water B-IO, 15 <br /> Cheesman Reservoirs and Roberts Tunnel. <br />6. Channel work on the NOlth Fork will maintain or Denver Water B-16 <br /> enhance structural trout habitat -CDOW will be <br /> consulted. <br />7. Operators will meet each spring with fishery, Denver Water and B-1? <br /> whitewater, and other interests to arrange upcoming Aurora <br /> o erations. <br />8. Install new equipment: low flow valve at Eleven Denver Water and B-12, 13, <br /> Mile, stream temperature monitors at Eleven Mile Aurora 15 <br /> and Cheesman Reservoirs, SNOTEL gages in <br /> watershed. <br />9. Stream Channel Maintenance and Improvement _ Forest Service, B-5 <br /> Identify degraded stream channel areas and CDOW, all interested <br /> sedimentation sources, and develop in-stream water users <br /> channel im rovement fa .ects. <br /> <br /> <br />N :\Supply\ Waage\wi Idscen\attachb.doc <br /> <br />B-iv <br />