Laserfiche WebLink
<br />Rio Grande Basin Roundtable Technical Meeting #1 <br />Meeting Summary <br /> <br />3. Enhance Use of Existing System Assets <br /> <br />Draft Subobjectives Presented <br />. Maximize operations of existing facilities <br />. Manage / reduce / capture unintentional reservoir spills <br /> <br />Comments <br />. Enhance the use of the existing groundwater recharge system <br />. The Rio Grande Restoration Study included a recommendation to consolidate headgates and <br />remove river obstructions, assisting water users and improving the water quality in the river <br />. Use vacant reservoir space to store other water, with permission of reservoir owner <br /> <br />4. Maximize Implementability <br /> <br />Draft Subobjectives Presented <br />. Optimize options for technical, legal, institutional, political, economical, and environmental <br />implementability <br />. Maintain compliance with Compacts <br />. Incorporate sustainability concepts <br /> <br />Comments <br />. Look at removing constraints to maximizing the beneficial use of water, within compact and <br />water law limitations <br />. Promote collaboration, not litigation <br /> <br />5. Support Recreational Needs <br /> <br />Draft Subobjectives Presented <br />. Provide for in-channel recreational uses <br />. Provide adequate reservoir levels for flatwater recreation <br />. Operate reservoirs to serve multiple purposes <br />. Acknowledge intangible value of recreation <br /> <br />Comments <br />. Strike and/ or revise all four sub-bullets from draft subobjectives presented and restate as <br />"Encourage the cooperative multiple use of water to enhance recreational and wildlife <br />opportunities" <br />. Encourage the cooperative multiple use of water to enhance recreational and wildlife <br />opportunities <br />. Objective should be re-titled "Support Recreational Opportunities" vs. "Support Recreational <br />Needs" <br />. Recreational opportunities should be supported within the Compact limitations and not <br />impact existing uses or users <br />. Terminology regarding instream flows is incorrect <br /> <br />CDIVI <br /> <br />6 <br /> <br />Rio Grande BRT Mtg #1 SummarLfinal.doc 11/14/2003 <br />