Laserfiche WebLink
<br />8M concept plan"doc <br />8/16/04- <br />Page 3 of 10 <br /> <br />.-') <br /> <br />3 ~ Power Plant backup supply ---------------------------------...------..----------------- 2,500 AF <br />4. Late season in-stream flow I San Miguel River -----------------------...-------....--------4,000 AF <br />5.. .Wrights Mesa Irrigation Supplemental-------------...-----------------------------14.100 AF <br /> <br /> <br /> <br /> <br />1r()1r}l~ ----------__~-_--___~~_._________~w________.____________-----~~~--~----------------~~,~O() Jl~ <br /> <br />Potential Solution <br />There have been several studies and cost estimates of the below mentioned facilities, beginning <br />with Bureau of Reclamation studies during the 19708, reviewed by Western Engineering in 1978, <br />reinforced by the CWCB'g 1989 Boyle Engineering study, and a cursory cost update by Harris <br />Water Engineering in 2003.. <br />Presently (as of 12101/03, a yet to be named firm), under contract to the San Miguel Water <br />Conservancy District, is in the process of developing a Water Storage, Management and <br />Conservation Plan for the San Miguel River Basin. It is realized that a smaIl portion of the <br />additional water supply needed can be derived from better water management and conservation <br />.... . ) measures. The present effort to develop such a plan will identify potential measures to be <br />imple~nted. <br />The following measures can provide the majority of the additional supply needed: <br />1.. Implementation of a Water Storage, Mgt & Cons Plan --------------------------..--1~500 AF <br />2.. Construction of Marie Scott Reservoir and appurtenant structures <br />Potential storage \is ------------------~-------------------------------------- 17,400 AF <br />3. Construct Straw Dam or Enlarge Lone Cone Reservoir----....--------------------- ..4..000 AF <br /> <br /> <br /> <br /> <br />1l()1r~-------------------------------------------------------------------------------------22t9()O AF <br />